1
82d CONTRACTING SQUADRON
CUSTOMER
EDUCATION
GUIDE
82d CONTRACTING SQUADRON
206 J Ave, Bldg 1662
SHEPPARD AIR FORCE BASE, TEXAS 76311
June 2015
2
PREFACE
We developed this guide so that we may better serve you, our customer. As a service
organization, we strive to provide the highest quality and best value contracting support
possibleand we need your help to make that happen. Commanders, Cost Center Managers,
Unit Resource Advisors, and anyone who has acquisition responsibility should become familiar
with the contents of this guide and keep it handy for ready reference. Please feel free to contact me
at extension 2663 should you have any questions or comments.
MICHAEL S. KENNEBRAE, Lt Col, USAF
Commander, 82d Contracting Squadron
3
SECTION A - ORGANIZATION
- Organization Chart…………………………………………………………………………………………..............................4
- Contracting Squadron Contact Numbers…………………………………………………………………….……......................... 5
- Flight Description……………………………………………………………………………………….............................6
SECTION B -ACQUISITION PLANNING
- Micro-Purchases (less than $3,000)..............................................................................................................................7
- Small Purchases (less than $150,000)...........................................................................................................................7
- Purchases Over $150,000...................................................................................................... .................................8
- Large Purchase Acquisition Strategies................................................................................................................................................8
- Required Delivery Date .........................................................................................................................................................................9
- Emergency Requirements......................................................................................................................................9
SECTION C - GPC (Government-wide Purchase Card)....................................................................................................10
SECTION D - PURCHASE REQUE
STS/ FORM 9’S
- Questions.......................................................................................................................................14
- Form 9 Instructions.....................................................................................................................................................................................17
- Form 9 Checklist.........................................................................................................................................................................................19
SECTION E - SPECIAL ACTIONS
- Information Technology (IT) Purchase............................................................................................................................20
- Contract Repair Procedures................................................................................................................... ................20
- Preparation of DD Form 1149......................................................................................................................................20
- Warranty or Guarantee Responsibilities.......................................................................................................................21
- Transportation of Equipment........................................................................................................................................21
- Maximum Repair Allowance (MRA)............................................................................................................................21
- Preventive Maintenance Agreements (PMAs)...............................................................................................................21
- Rental of Equipment....................................................................................................................................................................................22
- Sole Source.................................................................................................................. ...........................22
- Furniture Purchase........................................................................................................................................................................................23
- The Construction Contracting Process..........................................................................................................................23
- Brand Name or Equal Justification......................................................................................................................................................23
- Government Estimates............................................................................... ....................................................24
- Specifications...............................................................................................................................................................................................24
- Statement of Work/Performance Work Statement..................................................................................................24
- Special
Procurements...........................................................................................................................................................25
- Military Interdepartmental Purchase Requests (MIPR)....................................................................................................26
SECTION F - RECEIVING GOODS/SERVICES
- Inspecting/Receiving Goods and Services ................................................................................................................................27
SECTION G - CONTRACTING AUTHORITY
- Unauthorized Commitments/Purchases........................................................................................................................28
- Fraud, Waste & Abuse......................................................................................................... ...................................29
SECTION H - RATIFICATIONS
- Ratifying the Unauthorized Commitment......................................................................................................................................30
- Steps in Processing a Ratification..................................................................................................................................................30
SECTION I - MARKET RESEARCH
- Definition and Purpose ..........................................................................................................................................................33
SECTION J -
DO’S AND DON’TS
- Before Award DO
s....................................................................................................................................................................34
- Before Award D
ON’Ts
..............................................................................................................................................................34
- After an Award
DO’s
.................................................................................................................................................................34
- After an Award D
ON’Ts
............................................................................................................................................................35
SECTION K ACRONYMS..............................................................................................................................................................36
SECTION L GLOSSARY................................................................................................................................................................37
Coordination Contacts
.................................................................................................................................................42
4
5
COMMAND SECTION CONTACTS
FAX : 676-7829
Commander
676-5200
Director of Business Operations
676-4138
Front Desk
676-2663
Superintendent
676-4278
Unit Deployment/Training Manager
676-5352
Unit Program Coordinator
676-5177
SECTION CONTACTS
LGCA FLIGHT CHIEF
676-5180
Formal Acquisition Team Lead I
676-1668
Formal Acquisition Team Lead II
676-3895
Commercial Acquisition Team Lead
676-1604
LGCB FLIGHT CHIEF
676-5185
Construction Team Lead
676-6150
SABER Team Lead
676-2277
Infrastructure Services Team Lead
676-5189
LGCN FLIGHT CHIEF
676-5197
LGCP FLIGHT CHIEF
676-5183
GPC Coordinator
676-3352
QAPC
676-5187
System Administration
676-2606
6
Flight Description
The 82d Contracting Squadron is organized in four flights: Three Acquisition Flights and the
Plans and Programs Flight. Generally, each buyer within the flight is assigned certain classes of
items for which they are exclusively responsible.
“A” Flight (LGCA):
Made up of the Formal Contracts Team and the Commercial Acquisition
Team, this flight provides for the acquisition of supplies, equipment, and services for the entire
base. Performs administration of all purchase/delivery orders including follow-up on delayed
deliveries and services, item discrepancies, payment problems and other administrative functions
that may be required.
“B” Flight (LGCB):
Made up of the Construction Team, SABER Team, and Services Contracts
Team. This flight provides for the acquisition of construction services in support of the 82d
TRW and the 80
th
FTW. LGCB performs administration of all purchase/delivery orders
including follow-up on construction schedules, discrepancies, payment problems and other
administrative functions that may be required.
“NFlight (LGCN):
Provides for the maintenance and management of the Civil Engineering
Services contract.
Plans and Programs Flight (LGCP):
Maintains all information technology resources for the
squadron. This is flight is responsible for the operation and management of the automated
contracting systems (software and hardware) to include management of the Standard
Procurement System (SPS)/Procurement Desktop-Defense (PD2) and E-commerce initiatives.
Manage incoming purchase requests and interfacing between SPS and the Automated Business
Services System (ABSS) or the Defense Enterprise Accounting and Management System
(DEAMS) and monitors/reports on the acquisition workload. Manages the quality assurance and
government purchase card programs.
Whose Customer Am I?
If you need a supply, commodity, or service, you will likely be working with LGCA.
Government Purchase Card administration is in LGCP. Administration of the civil engineering
services contract is in LGCN. Base infrastructure and construction requirements are likely to be
processed in LGCB. All potential construction projects must be processed through 82 CES first,
using an AF Form 332. AF Form
332’s may also be required on
acquisitions for commodity-
type items that require minor construction work, including mounting on ceilings and walls. The
ultimate using agency deals directly with CE. The ultimate user is
CE’s customer
. If CE
assumes responsibility of, and funds the project, CE
is CONS’ customer.
If CE approves the
requirement for contract and returns the requirement to the customer for funding, the end user is
CONS’ customer.
7
SECTION B
ACQUISITION PLANNING
The acquisition process can be long and complicated for some requirements. However, if we
work together and plan ahead, we can ensure you get the product or service that you need
when
you need it. More time will be required for high dollar and highly complex acquisitions. In any
case, realistic goals coupled with thorough acquisition planning can help make the entire
process a smooth one. Developing a good acquisition plan is the first and most important
step in obtaining the best product or service to meet the Government
’s needs. The primary
planning
factor in terms of time required for procurement is cost. Keep in mind that before we
can enter into a contract, the contractor must be enrolled in the
System for Award Management
(SAM)
at https://www.sam.gov/portal/public/SAM/. This is a website that consolidates
the capabilities previously in CCR/FedReg, ORCA, and EPLS.
Micro-Purchases (less than $3,000)
Supplies less than $3,000.00, non-personal services less than $2,500.00, and construction
requirements less than $2,000.00.
Micro-purchases require competition only if prices are not considered reasonable. With few
exceptions, micro-purchases will be made using the Government-wide commercial purchase card
(GPC). All exceptions to using the GPC under the micro-purchase threshold must be approved
by the Wing/CC. Convenience checks are available at the contracting office for those vendors
who do not accept credit cards.
Small Purchases (less than $150,000)
A small purchase generally requires the solicitation of two or more price quotations. The quotes
are then evaluated and award is made to the offeror whose quote is in the best interest of the
Government.
Public Law 95-507 requires that all proposed acquisitions exceeding $3,000 but not over
$150,000 (except Construction) be reserved exclusively for small business. This is referred to as
a small business set
-
aside. After soliciting small business sources, the
Contracting Officer
may determine that there is no reasonable expectation of obtaining two or more quotations
from small businesses. In this event, the small business-small purchase set-aside may be
dissolved and new quotes solicited on an unrestricted basis.
Acquisitions for non-commercial items or services exceeding $25,000, but not exceeding
$150,000 have additional requirements to those acquisitions less than $25,000. The
Federal
Acquisition Regulation (FAR)
requires any acquisition within this range to be advertised in a
public place for a minimum of 10 days. Advertising is accomplished via electronic means. For
acquisitions of commercial items/services exceeding $25,000, but less than $150,000 the FAR
allows the Contracting Officer to determine appropriate advertisement periods.
8
Purchases Over $150,000
Purchases in excess of $150,000 take significantly longer than small purchases due to
administrative lead-times and reviews. The lead-time is further extended for those purchases
exceeding $500,000. In addition, requirements in excess of $150,000 for services will be
procured under the purview of an
Acquisition Team.
The 82 CONS Quality Assurance
Program Coordinator (QAPC) facilitates MFT meetings.
The Acquisition Team/Acquisition Strategy Panel (ASP), instituted by the 82
nd
TRW and
established by the Contracting Squadron Commander, supports the following:
1. Acquisition strategy development
2. Market research
3. Source selection and performance evaluation criteria development
4. Contract performance management/quality assurance surveillance
ASPs shall be convened for all acquisitions requiring a formal/written Acquisition Plan (AP).
The ASP chairperson may establish streamlined ASP procedures for acquisitions <$8M. The
group can be formed for each acquisition, by functional area, or as a standing body for review
of all service contract requirements. When planning for acquisitions over $150,000, a kick-off
meeting will be held to discuss funding, contract type, schedule, and basic performance
requirements. Subsequent meetings with functional personnel will be more detailed and focus
on things such as drafting requirements, source selection team composition, bid schedule, etc.
Acquisition Team/ASP members must be able to obligate themselves to a period of six
months to one year for the acquisition process. After the contract is awarded, the Acquisition
Team/ASP meets as required to address performance issues, and should always reconvene prior
to a decision to exercise an option on the contract.
LARGE PURCHASE ACQUISITION STRATEGIES
REQUEST FOR PROPOSAL (RFP)
Awarding a contract using this process will take longer, but when performance is critical, it will
provide the best results for the best value (not necessarily the lowest price). It also allows you,
the customer, more input into the acquisition process. There are two basic methods: low
price/technically acceptable and tradeoff source selection.
The
Low Price/Technically Acceptable
method is faster but provides less flexibility. You
evaluate which offers are technically acceptable, and then the Contracting Officer will make
the award based on lowest price.
With
Tradeoff Source Selections,
you obtain the best value based on the evaluation and
analysis of several factors such as price, delivery, past performance and in some cases technical
superiority. The idea behind tradeoff source selection is that the Government can pick the best
contractor for the job, is affordable, but is not necessarily the lowest-priced offer. During
discussions, the Government may ask offerors to explain specifically how they plan to
complete the job, how many people they will use, how they will organize the workforce, how
they will
9
Assure quality work, what equipment and materials they will use, etc. Contractors are afforded
the opportunity to improve their proposals through discussions.
Even though tradeoff source selections are the most suitable method for obtaining a best value
contractor, they
do require significant investments of time and human resources. Customers
must devote one technical representative (as a minimum) to support the technical evaluation
phase of the acquisition. Source Selection procedures are appropriate when technical
considerations are of paramount importance, but prior to deciding on this acquisition strategy, the
benefits should be compared to the additional costs involved in evaluation and the selection
process.
REQUIRED DELIVERY DATE (RDD)
RDD is the date the customer must have the requirement fulfilled. Your RDD should reflect a
date to include the time required to process a purchase request, prepare solicitation documents,
advertise the acquisition, receive and analyze bids or offers, obtain necessary approvals, issue a
contractual document, and allow adequate delivery time. In other words, the RDD must
consider the time from receipt of a purchase request to delivery of the commodity or service.
This date needs to be realistic, and extremely short delivery requirements generally become
excessively expensive procurements. This is because there is insufficient time to contact the
greatest amount of qualified vendors, and some of those contacted may not be able to meet the
delivery terms. Second, short delivery requires priority performance on the part of the
contractor, which also increases the price.
Estimated Amount Approximate Lead Time
$3,000 < $25,000 1 - 15 days
$25,000 < $150,000 7 -- 30 days
Over $150,000 120 days (minimum)
Complex construction and service contracts may require additional lead-time. Contact the
appropriate acquisition flight for an estimated schedule. You can also refer to the annual
“Contracting Back to Basics” handout, available on the Buy-Me-University Website.
EMERGENCY REQUIREMENTS
If you have an emergency requirement (safety, security, mission essential, etc.) please contact
your acquisition service team immediately. Special procedures exist for expediting requirements
under emergency conditions. After normal duty hours please contact the Command Post for the
number of a Contracting Officer.
10
Section C
Government-wide Purchase Card Program
PROGRAM OVERVIEW
AFI 64-117 is the governing instruction for the Air Force Government-Wide Purchase Card Program.
The Government-wide Purchase Card (GPC) Program is intended to streamline small purchase
methods by minimizing paperwork, streamlining the payment process, and simplifying the
administrative effort normally associated with traditional purchase methods for supplies and services.
The main goal is to provide Air Force users a simplified, streamlined method of purchasing and
paying for simple, low-dollar value, items of supply and service.
The primary benefits of purchase card usage are to reduce administrative paperwork, streamlines the
certification and payment process, enables vendor payment within 72 hours by Electronic Funds
Transfer through a commercial bank, eliminates or minimizes prompt payment interest through the
use of the online certification and payment system, and provides rebates to the Air Force based on
the dollar volume of use and timeliness of payment.
The primary use of the purchase card is to purchase supplies and services for official government
business valued at or below the micro-purchase threshold. Personnel not assigned to a contracting
office shall be delegated authority to use the GPC to make single purchases for products only up to
the micro-purchase threshold, which is $3,000 for goods, $2,500 for services where Service Contract
Act applies, and $2,000 for construction.
The purchase card may also be used as a method of payment in conjunction with other contracting
methods above the micro-purchase threshold depending on the type of contracting vehicle utilized,
with the appropriate delegation of authority. The delegation of authority is only given by a warranted
contracting officer and can only be given if the items are obtained from pre-priced government
contracts and agreements (e.g., Federal Supply Schedule (FSS), Blanket Purchase Agreements
(BPA), Indefinite Delivery/Indefinite Quantity ID/IQ contracts, AF mandatory contracts, etc.).
Authority to use the GPC may not exceed $25,000 per transaction. Contact the Contracting Office for
further assistance.
The GPC program coordinator provides training for new card holders and approving officials on a
monthly basis. Local Purchase Card programs shall be set-up to ensure that the ratio of cardholder
accounts to Approving Officials (AO) shall be no more than 7:1. In addition, consideration should be
given to the number of transactions per cardholder and AO is required to review. To schedule
mandatory training, or if you have any questions please contact the GPC Program Coordinator at
extension 676-3352.
UNAUTHORIZED USE OF GPC
Intentional use of the purchase card for other than official Government business will be considered
an attempt to commit fraud against the U.S. Government and will result in immediate cancellation of
11
an individual’s purchase card and disciplinary action. In the absence of specific statutory authority,
purchases of items for the personal benefit of government employees, such as flowers, food, etc., is
not permitted and represents improper transactions. The use of the purchase card for personal
purchases for any reason is strictly prohibited. The GPC card cannot be used for the following:
Cash advances.
Travel or travel related expenses.
Long-term rental or lease of land or buildings exceeding 30 days.
Sales, rental and lease of vehicles and classified requirements or other requirements that
require written contract terms and conditions.
Purchase of Centrally Managed Fuel or Oil, i.e., Aviation, Diesel, Heating, Gasoline, Oil for
Aircraft and Motorized Vehicles. Packaged oil and lubricants needed to support base
maintenance shops, however, may be purchased using the GPC.
Repair of GSA-Leased Vehicles.
Purchase of Major Telecommunications Systems including Federal Telecommunications/
Telephone System 2000 or Defense Switched Network.
Purchases of Hazardous/Dangerous Items such as Explosives, Munitions, Toxins, and
Firearms
Personal Services.
Gifts (e.g., retirements, farewells). These include food/beverages for organizational functions
(commanders-call, picnics, parties, awards programs), promotional items for conferences,
meetings, symposia (coins, mugs, coasters), and cash incentive awards. Likewise, rental of
banquet halls or similar facilities for these functions is not authorized.
Entertainment. Party supplies, serving material, food, and drinks are considered entertainment
and are prohibited unless specifically authorized by law.
Purchases of Controlled Cryptographic Items (CCI).
Repair or procurement of Budget Code 8 depot-level repairable items.
Safety-of-Flight items regardless of the Expendability, Reparability, Recoverability Category
(ERRC). Budget Code 8 XD Items
Utility Services. This includes electric, gas, water, phone, waste removal and cable TV
services. These services are typically consolidated base-wide and purchased through contracts
that generally exceed $3,000 a year
Purchase requiring advance payments, except for subscriptions or training purchased on a SF
182, Request, Authorization, Agreement, Certification of Training and Reimbursement
Purchases from Government employees
Supplies for Contractors
Items that are part of an existing contract (Examples include, but are not limited to: custodial
contracts such as cleaning supplies or vacuum cleaners, lawn maintenance items such as lawn
mowers, etc.) are prohibited
Cash Refunds.
Gift Checks, Rebates or Other Incentives. Under no circumstance will a cardholder retain gift
checks, vendor rebates, or other purchase incentives that can be converted to their personal
use. If received, these items must be turned over to the U.S. Treasury and documentation must
be accomplished by the cardholder.
Split Requirements. Cardholders shall not break down requirements aggregating more than the
simplified acquisition threshold (or for commercial items, the threshold in subpart 13.5) or the
micro-purchase threshold into several purchases that are less than the applicable threshold
12
merely to avoid any requirement that applies to purchases exceeding the micro-purchase
threshold. Urgency or expenditure of end-of-year funds does not relieve the cardholder or
approving official of this prohibited practice.
Cardholders are prohibited from making repeat buys of the same item to avoid the $3,000
limitation for purchasing and the $25,000 limitation for ordering using the GPC. In addition,
no purchase from the same vendor may exceed the single-purchase limit of $3,000 even if the
individual items comprising the purchase have unit prices that are less than $3,000.
If in doubt, business advice should be sought from the contracting office and comptroller office for
guidance on authorized and unauthorized uses of appropriated funds.
MANDATORY SOURCES
Effective 1 Oct 2011 all CONUS Air Force contracting offices and purchase cardholders must use
the Federal Strategic Sourcing Initiative (FSSI) Office Supply BPAs to purchase office supplies. The
FSSI BPAs are currently available on the Air Force Advantage website. The only exception is for the
purchase of toner cartridges. Due to highly competitive pricing on toner, it is important to check
prices on both FSSI and the Air Force Toner BPAs available on AFWAY for the specific toner
cartridge needed. Deviation from this policy is only authorized upon receipt of an approved waiver
from the Air Force Office Supply Commodity Council.
Compliance with mandatory priority and source requirements (FAR Part 8.002) still applies.
Effective 1 October 2011, in accordance with mandatory FSSI Office Supply II BPAs AF Ordering
Guide, all office supplies must be purchased online from Air Force-wide buying arrangements or
your local AbilityOne store.
In addition to the mandatory purchasing of office supplies, cardholders are also required to use
the mandatory Air Force Office Seating and Dormitory Furnishings Blanket Purchase
Agreements. Deviations from these policies also require an approved waiver. The BPAs are
currently available at https://www.afadvantage.gov/.
For other mandatory/recommended AF Strategic Sourcing Vehicles such as AFWay, NETCENTS,
Cellular phones, Defense Print & Imaging (DPI), and AF Tool & Parts Program, please refer to
Sheppard AFB GPC Homepage- AF Strategic Sourcing Vehicles at link-
https://afkm.wpafb.af.mil/ASPs/docman/DOCMain.asp?Tab=0&FolderID=OO-XP-AE-36-
17&Filter=OO-XP-AE-36 .
PURCHASES REQUIRING AUTHORIZATION
Some purchases require authorization before making the purchase. All authorizations must be
documented. If verbal approval is obtained, a memorandum for record shall be completed to
document the date and identity of the authorizing official. See Authorized/Coordination matrix for
items requiring approval/coordination from the controlling/servicing organization before making the
purchase.
SEPARATION OF FUNCTION
In order to protect the integrity of the procurement process there must be, at a minimum, a two-way
13
separation of functions for all purchase card transactions. This is defined as one person making the
purchase with the purchase card and a separate person receiving, inspecting and accepting the
purchase.
In cases where the cardholder is picking up the material at the vendor’s location, the end user or other
designated receiving personnel shall legibly print their name and title, then sign and date the receipt
confirming independent receipt and acceptance of the material or services.
In the event the purchase cardholder is the end user, he/she may sign the vendor receipt. However,
the purchase cardholder shall ensure another Government employee within the unit/organization co-
signs, along with their printed name and title, and dates the receipt
FUNDING DOCUMENT LIMIT
The funding document limit is a budgetary limit established on the AF Form 4009, by the unit
resource advisor in coordination with the AO and certified by the FMA. In all instances, the AO shall
obtain a certified funding document before the card can be used by the cardholder.
FMAs shall set quarterly spending limits on the approving official account at the same dollar value as
the AF Form 4009. Refer to AFI 64-117, paragraph 3.7 for more information on funding procedures.
NOTE: Overspending funds available on the AF Form 4009 will result in unit commander or civilian
equivalent notification and shall result in suspension of the cardholder’s and/or approving official’s
GPC privileges and/or other disciplinary action.
*For Coordination Contacts, see Page 42.
14
SECTION D
PURCHASE REQUESTS-
FORM 9’S
This section is broken down into three distinct areas:
- Common questions concerning purchase requests
- How to fill out a Form 9
- Form 9 checklists
QUESTIONS:
1) When are purchase requests required?
A purchase request constitutes the requirement for
effecting local purchase. It is required for an obligation of funds on a new contract or a
change to an existing contract.
2) Who initiates and approves purchase requests?
Only the Office of Primary
Responsibility (OPR) may originate and submit purchase requests. For example, one
customer may not request services/supplies on a project for which another activity is
responsible.
3) Who must ensure authority for local purchase?
The Contracting Squadron does not share in
the responsibility for erroneous or unauthorized purchase authority. It is in the best interest for
those who initiate purchase requests to protect themselves as well as their commander by being
certain that they do in fact have authority to obtain particular supplies or services by
contractual means.
4) What is the purchase request format?
Purchase requests generally fall into two
categories: automated and non-automated. The two automated customers are Base Supply
and Medical. Applicable forms/procedures should be ascertained from these activities and
current Air Force regulations. Requests from activities for non-supply items should be
submitted on an AF Form 9, "Request for Purchase."
5) Are there instructions for preparing the AF Form 9s?
General instructions can be found at
the end of this section.
6) Is there a difference between specifications and descriptions?
The primary difference
between a specification and a purchase description is the degree of detail. A specification is an
in-depth explanation of the service or supply by size, color, weight, material, etc. A purchase
description is a less involved explanation. It is written in simple language. Brand name
descriptions are prohibited without separate written justification. Current directives allow use
of a purchase description in lieu of specification when:
a. The purchase is under $25,000.
b. It is impractical or uneconomical to prepare specifications. However, if a
specification already exists for the item, use it.
15
7) Are there existing specifications for items? If you are requesting a supply or equipment
item, the first order of business is to determine if a formal specification already exists.
You can best do this by:
a. Researching your own functional area directives (technical orders, Air Force
regulations, etc.)
b. Consulting with the appropriate Supply Research Section.
c. Reviewing the DOD Index of Specifications and Standards. If no specification
applies, you must prepare either a description or specification as explained above.
8) How do I write a purchase description? A purchase description should be written in such
a manner as to clearly describe the essential physical and functional characteristics of the
item being purchased. It should include as many characteristics as necessary to express
the minimum requirements of the Government. Some that may be included:
a. Common nomenclature
b. Kind of material (such as type, grade, alternatives)
c. Dimensions, size or capacity
d. Significant restrictive environmental conditions
e. If part of an assembly, the location within the assembly of essential operating
characteristics (see question 9)
f. Special features
g. Intended use
h. Other requirements as appropriate
9)
What about “brand name or equal”?
An adequate purchase description is normally
easy to prepare. Labels, tags, etc. often contain considerable information from
the manufacturer. If, however, a description is not possible, another less desirable
alternative exists --B
rand name or equal. Brand name or equal descriptions may be used
for
supplies/equipment when it is otherwise not possible to describe the requirement. One
feature of this procedure must always be included: you must describe the outstanding
characteristics of the item. In other words, a product must be accepted as equal if it
performs the same general function as the brand name specified. Failure to do this will
not only prohibit contracting from accepting your purchase request, but may also subject
you to having to accept a product you cannot use. As an example, a 20" brand "X" lawn
mower with a 2 hp engine must be accepted as an equal to a 22" brand "Y" lawn mower
with a 3 hp engine unless you listed the 22" and 3 hp engine as essential characteristics.
10) My Form 9 was returned because of overly restrictive characteristics, why? A
description/specification that is too strict can be just as undesirable as the opposite
extreme
limiting competition, and driving prices up. Whenever possible, a description
should allow tolerance. For example, if an item needs to be painted, the color should
allow for variances unless only one color will suffice. Continue likewise with other
characteristics such as weight, size, etc.
16
11)
How do I get the brand I want? ― Brand Name justification can be used when a
customer submits a purchase request for a specific brand name, a letter of justification
must accompany the purchase request stating why only a particular brand name will meet
their requirements. For a sample letter and assistance on preparing a Brand Name
Justification Letter please reference the Buy-Me-University website.
12)
My Form 9 was returned because of inadequate/restrictive descriptions, why?
Poor
description/specifications contribute to misunderstanding between the Government and
the contractor. This will likely lead to receipt of inferior products, services or
unnecessarily high prices or both. Contracting Officers are charged with the
responsibility for reasonable prices to satisfy the Government
’s minimum needs.
Consequently, they are prohibited
from accepting inadequate or overly restrictive
descriptions or specifications. Purchase requests containing inadequate specifications or
descriptions will be returned to the initiator. Restrictive specifications or descriptions can
sometimes lead to protests on from the contractors. A protest will further complicate
and delay the acquisition of the supplies or services. Careful screening of purchase
request item descriptions by approving authorities will prevent delays in contracting
actions.
17
INSTRUCTIONS FOR COMPLETION OF
AF FORM 9 FOR COMMODITIES (SUPPLIES), OTHER THAN
COMPUTER REQUIREMENTS.
Block Number, Title and Information Required:
1.
NO.:
Enter the purchase request (PR)/requisition number.
Example: F3V3E11087A001
Position 1 F
(Air Force requirement)
Position 2 1
(AFB requirement)
Position 3 V
(Identifies Sheppard AFB)
Position 4 Alpha or numeric-See Chart below
(Organization Identifier)
0
Wing
1
Ops Group
2
Maintenance
3
Mission Support
4
Medical
5
Training
I
Recruiter
T
Tenant
Positions 5 - 6 Alpha or Numeric
(identifies organization; assigned by location)
Position 7 One-digit Calendar Year
Positions 8 10 Three-digit Julian Date
Position 11 One-character Document Type
Position 12 One-character Document Sub-type
Position 13 14 Two-character Sequence Number
NOTE: The Unit Resource Advisor can assist with identifying the correct BPN for your acquisition.
2.
INSTALLATON:
SHEPPARD AFB TX 76311.
3.
DATE:
Enter the date the purchase request is prepared; the date will be the same as the Julian date in Block 1.
Example: 6100 is the same as 9 Apr 06.
4.
TO: CONTRACTING OFFICER:
82 Contracting Squadron/LGCA
5.
CLASS:
FSC/PSC (Federal Supply Codes/ Product Service Codes) (Required)
PSC/FSC’s can be found here:
http://www.usabid.com/resources/tables/pscs/
6.
THROUGH:
If applicable
7.
FROM:
Squadron, office symbol, building/room number, grade, name, telephone number, and suite number.
8.
CONTRACT, PURCHASE ORDER OR DELIVERY ORDER NO.:
Leave blank.
18
9. PURCHASED FOR: Squadron and office symbol.
10. FOR DELIVERY FOR: Squadron, office symbol, street address and suite number.
11. NOT LATER THAN: Enter the priority rating: 03, 08 or 09 and the required delivery date (RDD). Enter the
priority number
A priority 03 is used for Emergency requirements and must be justified by a statement in the body of the form and
signed by either a squadron commander or a division chief.
A priority 08 is used for Urgent requirements.
A priority 09 is used for Routine requirements.
After you have entered the priority rating, enter the Julian date for the required delivery date (RDD).
12. ITEM:
Enter the serial number/cost center’s managers code (the last four digits in the requisition number)
for
each item. Each separately priced item in the Purchase Request is identified by separate CLINs
(Contracting Line Item Numbers); these CLINs are four digit numbers. Number items consecutively,
increasing the last digit by increments of one (e.g., 0001, 0002, 0003, etc.).
13. DESCRIPTION OF MATERIAL OR SERVICES TO BE PURCHASED: Provide item description with
sufficient detail to that someone other than the requestor knows what is to be procured. Use commercial
descriptions for commercial items.
NOTE: The customer is responsible for researching an existing stock number for a depot item; contact the
Research Unit at Base Supply for assistance. The information that is required on the DD Form 1348-6 is also
required on the AF Form 9.
14. QUANTITY: Enter the number of units for each item.
15. UNIT: Enter the unit of issue for each item.
16. ESTIMATED UNIT PRICE: Self-explanatory.
17. ESTIMATED TOTAL COST: Self-explanatory.
18. Enter the name, address, and telephone number of the suggested source below the description.
19. All purchase requests must contain the following Ozone Depletion certification IAW DFARS 5223.8:
“I HAVE REVIEWED THE REQUIREMENT, INCLUDING AVAILABLE TECHNICAL
DOCUMENTATION AND BELIEVE THAT IT DOES NOT REQUIRE THE CONTRACTOR TO USE
CLASS I OZONE DELPETING CHEMICALS (ODCs) IN THE PERFORMANCE OF THE
CONTRACT, NOR DOES IT REQUIRE DELIVERY OF A SEPARATELY IDENTIFIABLE CLASS I
ODC AS AN ITEM OF SUPPLY OR AS A PART OF ANY SERVICE.”
20.
Type Resource Advisor’s name and telephone number
. The unit Resource Advisor will provide entries
for the EEIC and the RCCC.
21. TOTAL: Self-explanatory
22. PURPOSE: Self-explanatory
23. Type the signature elements of the requesting official and the approving official (Commander, Functional Area
Chief or designee) and PLEASE SIGN. (Manually Submitted Forms) ABSS approval indicates electronic
signature.
24. An authorized Accounting and Finance Certifying Official will complete the remaining blocks.
19
AF FORM 9 CHECKLIST
The Contracting Officer will return/suspense Purchase Requests that are not properly prepared.
1. Is the requisition number in Block 1 comprised of the following variables the service
identification number, stock record account number (SRAN), Julian date, and the cost center
manager’s code (serial number)?
2. Did you adequately describe the supplies(s) or services you are requisitioning? If an item is
covered by a specification or drawing, did you attach the specification or drawing to the
AF Form 9?
3. There are no limits to the number of line items you may have on AF Form 9 to requisition
supplies/equipment, however, all the items should be provided by one source. This is
especially true for items on GSA contracts. If you need items from more than one source,
you must submit a separate AF Form 9 for each of the different sources.
4. Did you check the mandatory sources and contact 82 CONS squadron to help you make your
furniture requirement selections? Did you state the color, fabric, pattern, finish, and
model number of each item requested?
5. Is the PR signed by the Requesting Official and the Approving Official?
6. Did you enter the appropriate budget code?
7. Has the Resource Advisor (RA) signed the purchase request?
8. Some PR's are subject to availability of next fiscal year funds or next quarter funds; is the
appropriate certification annotated on the PR?
FOR A MORE IN DEPTH CHECKLIST- WHICH IS REQUIRED FOR ALL EOY
PURCHASE REQUESTS- PLEASE REFERENCE BUY-ME-UNIVERISTY WEBSITE
20
SECTION E
SPECIAL CONTRACTING ACTIONS
1. Information Technology (IT) Purchases
(COMPUTER EQUIPMENT)
Before 82 CONS receives the AF Form 9 for any COMM/IT purchase, an approval in the
current format SHALL be processed through the 82 Communications Squadron for a
technical solution. The AF Form 9, if processed through the proper channels, will be annotated
with a WOMS document indicating approval has been established. The request may be
purchased using the GPC card, Form 9, or existing contracting instrument depending on the
requirements, amount, and situation. Contracting will work with you to determine the most
appropriate method.
a. AFI133-210 states that all Information Technology requires ATO. Table 3.2 (page 15) states
that Stand-Alone systems are entered into EITDR and require the ATO process only. A Denial
of Authority to Connect (DATC) will be automatically assigned to the system.
b. AFI33-210, Paragraph 3.1.5. Stand-Alone IS. Stand-Alone systems may be single
machines, enclaves, or IS field at multiple locations; which, are not physically connected to any
other network. Each configuration of the Stand-Alone IS must have its own IT Lean version
approved.
c. Further guidance is found in DoDD 8500.016.8 and AFI133-210
2. Contract Repair Procedures
When an organization has determined that a piece of equipment is in need of repair from sources
other than those on base, the organization will initiate action for an AF Form 9, Request for
Purchase. The purchase request must be properly prepared and funded through Finance.
3. Preparation of DD Form 1149
After acceptance of the purchase request, Contracting will assign a request for quotation number.
When repair is not made on site, the organization will be instructed to prepare a DD Form 1149,
Requisition and Invoice/Shipping Document. This document is used for material/equipment
being transferred to contractors for repair. The document will be signed by the Contractor and
will be signed by the custodian or designated representative indicating return receipt. The DD
Form 1149 is either carried with the equipment to the Contracting Office or forwarded to TMO
when the item is shipped; TMO signs for it in that case (see DD Form 1149 for instructions).
NOTE: If equipment is not shipped, a hand receipt can be used to track equipment leaving
the Government' s possession for repair. The purpose is to maintain accountability for
items leaving the base.
21
4. Warranty or Guarantee Responsibilities
Equipment Custodians are responsible for the following:
a. Maintaining an accurate file on all current warranties and shipping.
b. Advising the Contracting Office when an item is processed for repair if it is warranted or
guaranteed.
c. Ensuring the warranty or guarantee accompanies any warranted or guaranteed item processed
for repair.
d.
Providing a purchase request for items to be processed for warranted service to cover the cost
of parts not covered by the warranty.
5. Transportation of Equipment
Transportation of Contract Repair Service (CRS) items will be either contractor pickup and
return (preferred method) or Government furnished. If the Government accomplishes
transportation, the requesting organization will request and arrange for transportation to and from
the contractor’s repair facility.
5. Maximum Repair Allowance (MRA)
The maximum repair allowance is limited to 75% of the current acquisition cost or estimated
replacement cost unless specified by Technical Order. The current acquisition cost can be
obtained from the Customer Authorized/Customer Receipt Listing, which is provided to each
equipment custodian by Base Supply. When the cost of repair exceeds the MRA, the equipment
custodian or requesting activity will be notified in order that they may determine the proper
course of action. Under emergency circumstances, up to 100% may be spent to bring an item to
a serviceable condition. This will be accomplished only if justification to exceed the normal
75% cost is submitted by the requesting activity.
6. Preventive Maintenance Agreements (PMAs)
Along with contract repair, we have Preventive Maintenance Agreements (PMAs). These
contracts are generally renewed 1 October each year and it is the customers responsibility to
notify 82 CONS of their requirements. Customers will provide a requirement to renew and/or
add maintenance prior to the effective date. Equipment items on warranty about to expire may be
added to the maintenance agreement during the quarter of the fiscal year in which the warranty
expires. PMAs provide for scheduled preventive maintenance services or periodic
maintenance inspections of equipment. Additionally, repair services can be included on an
as-required/call basis.
At the discretion of the Contracting Officer, PMAs are established based on customer-furnished
justification approved by the Contracting Officer. Signed contract instruments constitute this
approval.
The PMA Justification Letter is maintained in the contract file and must support the PMA as
being in the best interest of the Government and address factors such as:
a. Equipment manufacturer’s recommended frequency for scheduled maintenance.
22
b. Benefits or cost of scheduled or on-call maintenance versus the services on an as-needed
basis.
c. Critical or essential support the equipment provides and its impact on mission during
equipment failure.
d. Age, dependability, and warranty status of the equipment.
e. Historical frequency of repairs.
f. Availability or numbers of similar types of equipment, which can be used during
equipment failure or malfunction.
g. Maximum Repair Allowance (MRA) as estimated from replacement/current acquisition
cost minus any repair or maintenance costs incurred since acquisition.
Once the applicable factors to support the maintenance coverage for each piece of equipment are
established, the justification may be reused as often as it still applies for the maintenance
coverage. It should be retained for future use and updated as required. For BPA’s a call
authorization is also maintained in the contract file and must be updated annually.
8.
Rental/Lease of Equipment
Purchase requests for rental/lease of equipment (excluding vehicle rentals), must include a
written determination that rental is in the best interest of the Government. The requesting activity
must coordinate with 82 LRS and must have a lease versus buy analysis completed by 28
CPTS/FMA prior to bringing a rental AF Form 9 to contracting.
9.
Sole Source
A sole source item is one that can only be obtained from one vendor/contractor.
Competition is
the rule. Requests for procurement from a sole source require a written justification, and
certain limitations apply. If you have a requirement that you believe can only be obtained from
one source, please contact your contract specialist and see
FAR 13.106(b) and 6.303-2.
Additionally, if you believe you have a sole source requirement and the estimate is over
$150,000, the written justification and approval document will need to be detailed, so be
prepared to answer a number of questions:
What are the procurement’s minimum requirements? Material evidence should be available to
verify these minimum requirements.
What unique capabilities does the proposed contractor have which makes his/her only company
capable of meeting these requirements?
Was the item or service previously procured? If this is a continuation of a previous effort by the
same contractor, demonstrate why no other sources of supply are available. Can alternative
systems be used and obtained competitively?
Is there a technical data package, specification, engineering description, statement of work, or
purchase description available that is sufficient for competitive procurement? If not, is one being
developed? How much lead-time would be required to develop it? Has any cost-benefit analysis
been conducted to determine whether it is advantageous to the Government to buy or to develop
23
such information? If not, what evidence is available to demonstrate why this analysis is not
needed? Can alternative methods (e.g. observation) be used to provide information sufficient for
competition? Can individual components of the procurement be competitively procured? What
steps are being taken to foster competition in subsequent procurements of this product or
service?
*For Sole Source Letter Template, see the Buy Me University Website
10. Furniture Purchases:
Furniture purchases must meet specific requirements, for this reason, the first thing to do is to
coordinate with the commodities element of the Contracting Squadron. The Air Force has
standardized most of its furniture procurement through mandatory strategically sourced Blanket
Purchase Agreements. The following chart outlines what is purchased via one of these BPAs:
Seating
Dorm
Furnishings
I
Systems &
Modular
Furniture
Filing &
Storage
Executive
Office &
Conference
Furniture
(EOCF)
Flooring
Dorm
Furnishings
II
(Unaccompa
nied
Housing)
Awarded:
July 2011
Cancelled:
July 2013
Awarded:
September
2013
Awarded:
January
2014
Projected
Award Date:
May 2014
Projected
Award Date:
March 2015
Projected
Award Date:
June 2015
Office
Chairs
Conference
Seating
Guest
Seating
Other
Seating
Related
Services
Beds
Dressers
Wall
Lockers
Chairs
Night Stands
Mattresses
Cubicle
Furniture &
Panels
Systems
Components
Demountabl
e Walls
Design &
Installation
Lateral File
Systems
Free-
Standing
Storage
Units
Free-
Standing
Shelving
Accessories
Related
Services
Credenzas
Tables
Conference
Tables
Lounge &
Reception
Area
Furniture
Accessories
Modular
Carpet Tile
Roll Goods
(broadloom)
Walk-off
Carpet
Dormitory
Furniture
Common
Area
Furniture
Bedding
Window
Treatments
Mattresses
Small
Appliances
Lighting
24
The FAR
requires
the Federal Prison Industry (FPI), also known as UNICOR to be
considered for all furniture purchases.
Customers shall solicit and/or review products offered
by UNICOR in all furniture acquisitions. If a UNICOR product does not or cannot meet the
requirements, a reasonable price, or delivery time, the customer shall provide documentation
stating the reason(s). The Commodities elements of LGCA will assist customers in soliciting
UNICOR on all furniture acquisitions made through the contracting office.
11.
The Construction Contracting Process
82 CES will send a complete package to the Construction Team (82 CONS/LGCB) for
issuance. A complete package consists of specifications, drawings, AF Form 9, all
programming documents, justification letters, etc. The processing time for construction
projects varies by dollar value, acquisition strategy, and complexity.
Once a contract is awarded by 82 CONS and a Notice to Proceed is issued to the contractor,
construction will begin. At this point, contract administration and monitoring is done by 82
CONS/LGCB, CE Contract Management performs inspection. Again, the ultimate user will
contact 82 CES with any questions or problems concerning the project.
Neither 82 CES nor you (the ultimate user) have any authority to direct the construction work or
the contractor. The contractor takes his/her work direction from the contract. Again, the
Contracting Officer is the ONLY person authorized to contractually bind the Government.
12.
Brand Name/Brand Name or Equal Justification
Brand Name Justification is used when only a certain brand will fulfill a requirement.
For example:
Mission: requires a soft drink with 23 flavors and a PhD. Dr. Pepper is the only beverage
that can fulfill this requirement. However Dr. Pepper can be purchased at any store or restaurant
o Still must be competed because one store could offer Dr. Pepper at a lower price
*For Brand Name Justification, see the Buy-Me-University Website
13. Government Estimates
The responsibility for establishing the Government estimate resides with the technical experts
from the requesting agency. Estimates
should not
only be based on vendor quotes. Doing so
prohibits fair competition. Instead, estimates should be based on the expert’s experience,
minimum needs of the Government, contract requirements, and historical data from previous
similar purchases. Estimates must be treated as
FOR OFFICIAL USE ONLY.
Such estimates
must not
be revealed to the public under any circumstances. Disclosure would put the
Government at a disadvantage in dealing with proposed contractors. Moreover, it gives vendors
who have received the information an unfair advantage over other vendors competing for the
same requirement. Government estimates must be furnished as part of the requirements
package and must be detailed and relia
ble enough to allow for comparison of the contractors
proposal to the Government estimate (this is the technical evaluation process). If the contractor
is being asked to price several items, then there must be a Government estimate for each of the
line items requested. The preparer of an independent government estimate must answer the
25
following questions: How was the IGE was developed? What assumptions were made? What
information and estimating tools were used? Where was the information obtained? How did
previous estimates compare with prices paid?
14. Specifications
All requirements estimated to exceed $150,000 require detailed technical specifications. For
more information on what is required for new and recurring requirements, contact the Quality
Assurance Program Coordinator (QAPC) at 676-5187 or the Contracting Officer on your existing
contract.
15. Performance Work Statement (PWS) / Statement of Work (SOW)
A Performance Work Statement (PWS) is a statement of work for performance-based
acquisitions that describes the required results in clear, specific and objective terms with
measurable outcomes. The PWS should state requirements in general terms of what (result) is to
be done, rather than how (method) it is done. The PWS gives the contractor maximum flexibility
to devise the best method to accomplish the required result. The PWS must be written to ensure
that all offerors compete equally. The U.S. Government must remove any features that could
restrict a potential offeror. However, the PWS must also be descriptive and specific enough to
protect the interests of the U.S. Government and to promote competition. The clarity and
explicitness of the requirements in the PWS will invariably enhance the quality of the proposals
submitted. A definitive PWS is likely to produce definitive proposals, thus reducing the time
needed for proposal evaluation.
When a contract is awarded, the PWS is legally binding upon the contractor and the U.S.
Government. It provides an objective measure so that both the U.S. Government and the
contractor will know when increments of work are completed and payments are justified
A Statement of Work (SOW) is a portion of a contract which establishes and defines all non-
specification requirements for contractor’s efforts either directly or with the use of specific cited
documents. The SOW should specify in clear, understandable terms the work to be done in
developing or producing the goods to be delivered or services to be performed by a contractor.
Preparation of an effective SOW requires both an understanding of the goods or services that are
needed to satisfy a particular requirement and an ability to define what is required in specific,
performance-based, quantitative terms. A SOW prepared in explicit terms will enable offerors to
clearly understand the government's needs. This facilitates the preparation of responsive
proposals and delivery of the required goods or services. A well written SOW also aids the
Government in the conduct of the source selection and contract administration after award.
After contractor selection and contract award, the contract SOW becomes a standard for
measuring contractor performance. Consequently, the SOW writer must consider the contractual
and legal implications of the SOW during its preparation. As the contracted effort progresses, the
government and the contractor will refer to the SOW to determine their respective rights and
obligations. In this respect, the SOW defines the contract and is subject to the interpretations of
contract law. The SOW must clearly define the work to be performed, since the language
detailing the contractor's effort may be pertinent to legal questions concerning the scope of work.
26
82 CONS is available to provide any additional guidance.
*For Example PWS/SOW, see the Buy Me University Website
16. Special Procurements
Supply Requirements
Supply Requirements must be coordinated with 82 LRS when they are
National Stock Number (NSN) ite
ms that are coded for supply depots to ―Base Supply.
If the
items are coded for local purchase, they will be bought using the GPC or using an AF Form
9.
Books and Publications
- Books and Publications must be routed through the Base Library.
Printing and Binding
- Printing, binding, or other related reprographic services and high-speed
printers/copiers must be approved by the Defense Automated Printing Service (Printing
Management, 676-4582).
Lease of Equipment
- Lease of Equipment in excess of a 60-day period requires the requesting
activity to submit an economic analysis for lease versus buy with an explanation of why it is
more advantageous to the Government to lease the equipment in lieu of purchasing the item.
This analysis must comply with requirements identified in FAR 7.4 and must be coordinated
with the Financial Analysis Office (82 CPTS/FMA 676-2909) before the AF Form 9 is
processed.
Paid Advertisements
- Paid advertisements cannot be placed by Contracting without prior
written approval, as required by FAR 5.502. Authority to approve the publication of paid
advertisements in newspapers is delegated to one level above the Contracting Officer.
Contact the respective Acquisition Flight for approval.
17. Military Interdepartmental Purchase Requests (MIPR)
A DD Form 448, Military Interdepartmental Purchase Request (MIPR) (reference DFARS
253.208.1) is a request for materiel, supplies, or services submitted to a performing/servicing
activity within the Federal Government. This document is initiated by a requesting organization,
processed in the Automated Business Services System (ABSS) and must be routed to the
approving official(s), through Contracting, budget, and ALO offices. The document also
provides authority and funding to the performing/servicing Government activity.
27
SECTION F
INSPECTING/ RECEIVING GOODS AND SERVICES
What to do when you have received damaged merchandise, partial shipment of an
order, or the wrong item(s):
1. The process for requesting follow-up on delinquent purchase orders is determined
whether you are an automated or non-automated customer.
2. Automated customers will first contact Base Supply or Medical Supply. They will assist
and provide you with a status.
3. Non-automated customers deal directly with their acquisition flight. Be prepared to tell
us the contract number or the purchase order number on the AF Form 9 (purchase request)
and the nature of your concern.
4. If the delivery date has passed and the merchandise is not received, be sure to contact us
immediately.
Check the ―Ship To/Mark For block
on the order to assure the item is
not tucked away in a corner somewhere. It is not productive to call the contractor only
to find that it was on a Government receiving dock.
If you receive the wrong item, part of an item, or a broken/damaged item, call us, but follow up
in writing. Be prepared to describe what you received versus what the order states. The best
method is not to sign the receipt. Sometimes, however, the discrepancy is not immediately
apparent. In any event, call us as soon as practical (even while the delivery truck is still there if
possible) and we will assist you. NEVER deal directly with the vendor in resolving a
discrepancy.
28
SECTION G
CONTRACTING AUTHORITY
The Federal Government has the inherent power to enter into contracts. This contracting
authority is delegated to the heads of agencies, including the Secretary of the Air Force.
Such
authority is not otherwise a function of command or duty title.
This authority is ultimately
delegated from the MAJCOM division chief for Contracting to field level Contracting Officers.
These warranted individuals are appointed as Contracting Officers and become agents of the
U.S. Government. They are the
only
people authorized to enter into or change existing contracts
or agreements that will obligate funds for the Government.
UNAUTHORIZED COMMITMENTS/PURCHASES
This is a critical issue Commanders and their personnel need to understand. An unauthorized
commitment occurs when a person who has not been
specifically
delegated contracting authority
obligates Government funds by acquiring commodities or services from a commercial source.
Such unauthorized contracting actions are a violation of federal law and could lead to
disciplinary action.
To an ordinary taxpayer, we are all representatives of the Government and they may not know
the distinction between those authorized vs. unauthorized to obligate funds for the Government.
This can give the vendor/contractor an unintentional impression to deliver goods or perform a
service. It is your personal responsibility as a Government employee or military member to
recognize this difference and to know what is within your authority.
Here are some tips that may protect you from committing an unauthorized action:
1. Before asking a contractor to perform a product demonstration, make sure you obtain
Contracting coordination and approval.
2. Do not ask a contractor to make changes in technical provisions of a contract without
prior knowledge and written approval of the Contracting Officer.
3. Do not tell a contractor to stop work on an existing contract (unless a matter of safety).
4. Do not make statements regarding proposals that might be construed as a commitment of
the Government.
5. Do not accept supplies or equipment from a vendor on a
trial basis.
Ensure that a
Contracting Officer issues a contractual document before ordering or receiving any
type of supply or service from a contractor.
6. Do not advise a vendor that the Government will be procuring certain supplies or
equipment as soon as contracting gets the paperwork.
7. You could be held financially liable for any unauthorized commitment.
29
Fraud, Waste, and Abuse
Each year the Air Force loses millions of dollars because of fraud, waste, and abuse. Over half
of the Air Force’s annual bu
dget is obligated by contracts. You can help deter fraudulent actions by
reporting them to the proper officials. Suspected fraud involving contractors should be reported
to 82 CONS (676-4138), the 82 TRW/IG (676-2222), or the Air Force Office of Special
Investigations (AFOSI) at 676-4199.
30
SECTION H
RATIFICATIONS
A ratification is the process a Contracting Officer uses to correct an unauthorized commitment
made by a Government representative who was not authorized to expend Government funds.
RATIFYING THE UNAUTHORIZED COMMITMENT
UNAUTHORIZED COMMITMENTS CAN BE RATIFIED ONLY IF ALL OF
THE FOLLOWING ARE MET:
1.
The Government receives benefit of receipt of the items/services.
2.
The Government had authority to enter or could have entered into a contract when the
unauthorized commitment was made.
3.
The action would have been proper if accomplished by a warranted Contracting Officer.
4.
The Contracting Officer recommends payment and the legal office (82 TRW/JA) reviews
and determines legal sufficiency.
5.
Funds are available and were available at the time of the unauthorized commitment.
STEPS INVOLVED IN PROCESSING A RATIFICATION
Normally, the unit becomes aware that a potential unauthorized commitment has occurred when
someone acting as a Government representative receives an invoice from a commercial
contractor/vendor demanding payment for delivery of an item or performance of a service. The
82nd Contracting Squadron or the comptroller staff may also receive such an invoice. After
minimal research, we can determine if a Contracting Officer was ever involved in the process
or if a contractual document/order was ever placed for that item or service. When the
commitment occurs without the benefit of Contracting Officer authority, the following
steps must be completed to determine the circumstances surrounding the potential unauthorized
commitment, and to determine if the action can be ratified, thereby, approving payment using
Government funds.
1.
The responsible organization (and individual, if known) is notified of a potential
unauthorized commitment by 82 CONS.
2.
The individual who committed the unauthorized action prepares a statement of facts
describing all pertinent details of the transaction, accompanied by all relevant
documents and records. The statement must also include a description of action taken
to prevent recurrence of the unauthorized act.
31
3.
The individual’s statement and supporting documentation is forwarded to the squadron
commander or staff chief having jurisdiction over the individual involved.
4.
The responsible commander/staff chief reviews the individu
al’s statement of facts and
supporting documentation.
5.
The commander/staff chief concurs or non-concurs with processing the unauthorized
commitment for ratification, and forwards the individuals statement and supporting
documentation to his/her group commander or the vice wing commander, under a
separate cover letter, agreeing or disagreeing with the package. This letter must also
include a description of actions placed into effect to prevent recurrence, and identifies
what disciplinary action was taken, or justifies why none was appropriate.
6.
The commander/staff chief sends the package to the group/vice commander for
endorsement. The group/vice commander then sends it to the Contracting Officer who
will determine the adequacy of the record submitted by the responsible organization,
obtaining further documentation, as necessary. The Contracting Officer will prepare a
statement of facts summarizing the unauthorized commitment to include an analysis of
price fair and reasonableness. The 82 TRW/JA will advise as to legal sufficiency of the
Contracting Officer
’s determination.
7.
After legal review, the 82nd Contracting Squadron Commander will determine if the
action is to be ratified or remain an unauthorized commitment.
8.
For those unauthorized commitments determined by the ratifying official not to be
ratifiable, a letter will be issued to the responsible squadron commander/staff chief
stating that Government funds
shall not
be used to pay for the item/service. The
responsible individual(s) will be held personally liable for direct cost settlement with the
contractor/vendor.
9.
Per AETC FAR SUP instruction, a copy of the Contracting Officer
’s statement of facts
on each locally approved ratification ($30,000 or less) must be forwarded to HQ
AETC/LGCQ after ratification is complete.
10.
The 82 CONS/CC will send the complete file on proposed ratifications valued over
$30,000 to HQ AETC/LGCQ for possible ratification processing.
11.
The Contracting Officer will prepare a statement of facts summarizing those
unauthorized commitments approved for ratification, to include an analysis of the prices
involved to support a fair and reasonable determination.
NOTE:
The resource advisor and/or cost center manager are vital players in preventing
unauthorized commitments within your unit. All funding transactions related to the purchase of
contract items or services must be coordinated and approved by them.
NOTE: ALL RATIFICATIONS MUST BE REPORTED TO HQ AETC/LGC.
32
If the action is ratified, the Contracting Officer issues a contract and pays the contractor. The
individual who committed the act may receive one or more of the following disciplinary
actions:
a.
Letter of Counseling (for both civilian and military personnel).
b.
Article 15 (may include reduction in rank).
c.
Removal from Government employment.
IF THE ACT IS NOT RATIFIED, YOU COULD RECEIVE ONE OR MORE OF THE PUNISHMENTS
LISTED ABOVE IN ADDITION TO BEING PERSONNALLY RESPONSIBLE FOR RESTITUTION
TO THE COMMERCIAL SOURCE.
33
SECTION I
MARKET RESEARCH
Market research is the first step in any acquisition and is a statutory requirement. This
research is an essential element of building an effective strategy for the acquisition of
commercial items and establishes the foundation for the agency description or need. It is
conducted appropriate to the customers, to determine whether a match exists between the
commercial sources for commercial items and an agency's requirements. The extent of the
market research will vary depending on urgency, estimated dollar value, complexity, past
experience, and other factors.
Definitions:
Commercial Item: Service of a type offered and sold competitively in substantial quantities in the
commercial market place based on established catalog or market prices for specific tasks
performed under standard commercial terms and conditions.
Market Research: Gathering and analyzing data to shape acquisitions and meet Department of
Defense needs.
The purpose of market research is to plan an acquisition strategy to ensure maximum effective
use of competitive market forces.
Contracts for commercial items shall rely on the contractor's existing quality assurance
systems as a substitute for Government inspection and testing before acceptance unless customary
market practices for the commercial item being acquired include in-process inspection. Any in-
process inspection by the Government shall be conducted in a manner consistent with
commercial practice.
34
SECTION J
CUSTOMER DOs AND DON’Ts
BEFORE AWARD
DO’s
1. Consider administrative lead-time in computing required delivery date (RDD).
2. Provide specific shipping destination or include firm shipping instructions on purchase
request.
3. Consolidate requirements to permit procurement for the same or similar items for
economy in purchasing.
4. Provide names of all known qualified sources with the purchase request.
5. Determine the scope and extent of Government-Furnished Property (GFP) to be provided
under the contract and assure availability.
6. Logically justify reason for sole source requirements. Any purchase requests must be
accompanied by a detailed written justification, which may result in the award of a
contract without providing for full and open competition. Perform market research to
learn more about industry practices.
7. Consult with the appropriate contracting flight if you need assistance.
DON’Ts
1. Write specifications to obtain a product/service from only one source.
2. Reject all but one technical proposal without attempting to qualify the others.
3.
Include brand
-name-or-
equal description features peculiar to only one manufacturers
product unless such features constitute an essential minimum need.
4.
Reject an equal item because of minor differences in design.
AFTER AN AWARD
DO’s
1. Contact and obtain from the Contracting Officer his/her decision on any matter relating to
contract reductions, extensions, or changes to performance.
2. Notify the Contracting Officer if, during the life of the contract, you become aware of the
contractor experiencing technical or financial difficulties.
3. Immediately notify the Contracting Officer of engineering problems.
4. Perform inspection/test on delivered items promptly.
5. Inform the Contracting Officer of any performance discrepancies immediately.
6. Promptly process evidence of receipt, so that contractor may invoice and be paid.
35
DON’Ts
1. Tell contractor to ship items anywhere except as stated in the contract.
2. Give verbal shipping instructions for GFP without proper documentation and notice to
the Contracting Officer.
3. Give the contractor any GFP items without proper documentation and notice to the
Contracting Officer.
4. Direct a contractor to do work that is not authorized in the contract (this includes
accelerating delivery).
Remember to protect the Government
s interest at all times when dealing with contractors.
Avoid gratuities and relationships that might be interpreted as preferential treatment of one
contractor over another.
36
SECTION K
ACRONYMS
ABSS
Automated Business Services
System
ACRN
Accounting Classification Reference
Number
AFFAR
Air Force FAR Supplement
AFWAY
Air Force Way
A/OPC
Agency/Organization Program
Coordinator
AP
Affirmative Procurement
ASP
Acquisition Strategy Panel
BDO
Blanket Delivery Order
BPA
Blanket Purchase Agreement
BV
Best Value
CA
Contract Administrator
CBD
Commerce Business Daily
CCR
Central Contractor Registration
CICA
Competition in Contracting Act
CLIN
Contract Line Item Number
CO
Contracting Officer
COR Contracting Officer Representative
COC
Certificate of Competency
CRS
Contract Repair Services
DAC
Defense Acquisition Circular
DAPS
Defense Automated Printing Service
DCAA
Defense Contract Audit Agency
DFARS
Department of Defense FAR
Supplement
DO
Delivery Order
DBO
Director of Business Operations
EDI
Electronic Data Interchange
FAR
Federal Acquisition Regulation
FFP
Firm Fixed Price
FPI
Federal Prison Industries (UNICOR)
GAO
General Accounting Office
GPC
Government Purchase Card
GSA
General Services Administration
HAZMAT
Hazardous Materials
IAPS
Integrated Accounts Payable System
ID/IQ
Indefinite Delivery/ Indefinite Quantity
IFB
Invitation for Bids
JWOD
Javits- Wagner-O'Day Program (now
AbilityOne)
MFT
Multi-Functional Team
MIPR
Military Interdepartmental Purchase
Request
MOD
Modification
MRA
Maximum Repair Allowance
OPR
Office of Primary Responsibility
PBA
Performance Based Acquisition
PO
Purchase Order
PR
Purchase Request
PSC
Procurement Stock Class
PWS
Performance Work Statement
QA
Quality Assurance
QAPC
Quality Assurance Program
Coordinator
QASP
Quality Assurance Surveillance Plan
RFP
Request for Proposal
RFQ
Request for Quotation
SABER
Simplified Acquisition of Base
Engineering Requirements
SAP
Simplified Acquisition Procedures
SAT
Simplified Acquisition Threshold
SBA
Small Business Administration
SCLIN
Sub Contract Line Item Number
SON
Statement of Need
SOO
Statement of Objectives
SOW
Statement of Work
SPS
Standard Procurement System
SRAN
Stock Record Account Number
WAWF
Wide Area Work Flow
37
SECTION L
GLOSSARY
1. ACQUISITION: The attainment of supplies and services (including construction) by
contract with appropriated and non-appropriated funds by and for the use of the federal
Government through purchase or lease, whether the supplies or services are already in
existence or must be created, developed, demonstrated, or evaluated.
2. AUTHORIZED AGENT: An authorized agent of the federal Government is an
individual that is authorized to sign contracts on behalf of the Government. At the base
level, the Contracting Officer is the authorized agent of the Government. A
warranted Contracting Officer is the only agent authorized to obligate Government funds
for products and services, other than GPC purchases, and to make changes to such
contracts.
3. AMENDMENT: A change to a solicitation made to incorporate different or additional
requirements.
4. BLANKET PURCHASE AGREEMENT (BPA): An agreement with open market
vendors. It is similar to a charge account. It allows the Government to make frequent
purchases or calls, verbally or in writing. One monthly bill is received for all supplies or
services purchased. Pre-
priced BPA's are based on a vendors price list.
User may order
his/her own supplies and services.
5. CHANGE ORDER: Unilateral directive issued by the Contracting Officer directing a
modification to a contract.
6. COMPETITION ADVOCATE: Individuals responsible to ensure acquisition
requirements are structured to allow maximum competition.
7. CONTRACT: A general term applied to all types of agreements and orders for the
acquisition of supplies or services. The term contract normally refers to actions over
$150,000.
8. CONTRACT ADMINISTRATIVE LEAD TIME (CALT): The time required by 82 CONS
to review and evaluate a purchase request (PR), prepare and receive requests for proposals,
and award the resulting contract. CALT starts when a properly prepared
38
PR together with other applicable documents is received by the 82 CONS. United States Air
Force (USAF) and Air Education Training Command (AETC) regulations establish CALT.
10. DELIVERY ORDER: An order placed against a contract. Prices and terms have already
been determined for the supplies or services.
11. ELECTRONIC DATA INTERCHANGE (EDI): Paperless contracting; the complete business
cycle is performed electronically. It is a direct computer-to-computer exchange of data
with no manual intervention.
12. FEDERAL ACQUISITION REGULATION (FAR): This directive applies to all federal
contracting, not just the Air Force, and is based on public law. It is written jointly by
General Services Administration (GSA), National Aeronautic and Space Administration
(NASA), and the Department of Defense (DOD).
13. FORMAL CONTRACT: A multi-page agreement containing numerous terms and
conditions. This instrument is required for all non-commercial purchases over $150K and
must be preceded by issuance of a formal solicitation (RFP or IFB). The entire formal
contracting procedure is a lengthy process involving a relatively long lead-time
(approximately 75 to 150 days).
14. INVITATION FOR BID (IFB): A publicized solicitation for bids used in formally advertised
sealed bid acquisitions.
15. INSPECTION/ACCEPTANCE: The examination (including testing) of supplies and services
to determine whether they conform to contract requirements.
16. INSPECTOR: The person who examines supplies, services, and/or construction to
determine conformance to contract requirements. Normally the Base Operating
Support contract personnel (DS2) or a designated Contracting Officer Representative
(COR) is an inspector.
17.
GOVERNMENT PURCHASE CARD (GPC)
: Governmental wide credit card program to
facilitate the purchase of supplies under $3,000, services under $2,500 or construction
projects under $2,000.
18. MARKET RESEARCH: The process used for collecting and analyzing information about
the entire market available to satisfy the minimum agency needs to arrive at the most suitable
approach to acquiring, distributing, and supporting supplies and services.
19. MODIFICATION: A change to an existing contract, purchase, or delivery order to
incorporate different or additional requirements.
39
20. MICRO-PURCHASES: An acquisition of supplies or services (except construction), where
the aggregate amount does not exceed $3,000. Micro-purchases for construction are
limited to $2,000.
21. NEGOTIATION: The making of purchases and contracts without the use of sealed bids.
This does not mean without competition. Negotiation simply allows for further discussion and
revision of offers after receipt of proposals.
22. OFF-THE-SHELF: Procurement of existing systems or equipment without a research,
development, test, and evaluation program or with minor development to make system suitable
for Government needs. May be commercial system/equipment or one already in the
Government
’s inventory.
23. OBLIGATION: A legal requirement for the disbursement of funds based on orders placed
contracts awarded, services received, or other contractual documents.
24. OPEN MARKET: Designates an item is available for purchase from commercial concerns
and not from GSA, Federal Supply Schedules or other Government contract services.
25. OTHER KEY GOVERNMENT PERSONNEL: This may include performance
monitors, inspectors, technical experts, or others who provide information that helps the
COR monitor contractor performance. For example, medical personnel who provide peer
review but are not designated COR.
26. PERFORMANCE WORK STATEMENT: A document that accurately describes a service
in terms of output requirements and the required quality level or standard of acceptable
performance of those outputs.
27. PROCUREMENT: The complete action or process of acquiring or obtaining goods or services
using any of several authorized means.
28. PURCHASE DESCRIPTION: A description of the essential physical characteristics and
functions required to meet the Government
’s minimum needs.
29. PURCHASE ORDER (PO): A simplified contract awarded under simplified
acquisition procedures (under $150,000).
30. PURCHASE REQUEST (PR): AF Form 9, DD 1348-1, and DD 1348-6, or other
authorized form, which is prepared as the request for any contracting action. It is prepared
by the activity authorized to request direct contracting support for purchase of supplies,
services, or construction.
31. CONTRACTING OFFICER REPRESENTATIVE (COR): The authorized representative
of the Contracting Officer for the technical functions of a service contract. He/she is not
authorized to direct the contractor to take any action which would affect the terms,
conditions, provisions, or price of a contract.
40
31. QUALITY ASSURANCE PROGRAM COORDINATOR (QAPC): The authorized
individual within the contracting squadron who coordinates the installation COR Program.
32. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP): A QASP provides
systematic procedures to inspect services and contractor performance. In addition, a decision
table (e.g., services summary, services delivery summary, performance requirements
summary, etc.) explains when the service is or is not acceptable.
33. RATIFICATION: The formal approval of unauthorized contractual actions that are
otherwise proper, but were initiated or approved by persons without the requisite authority.
34. REQUEST FOR PROPOSAL (RFP): A solicitation issued for acquisitions with estimated
value greater than $150,000 that generally results in the award of a formal contract using
negotiated techniques.
35. REQUEST FOR QUOTATION (RFQ): A solicitation issued for purchases of under $150,000
using simplified acquisition procedures, and resulting in the placement of purchase orders.
Requests over $25,000 must be synopsized in FedBizOps.
36. REQUIREMENTS CONTRACT: A contract where prices are established for supplies or
services but the quantity and frequency of deliveries are indefinite. Under this type of
arrangement, delivery orders are used to order needed supplies or services.
37. SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS
(SABER) PROGRAM: Designed to expedite contract execution of Base Civil
Engineering (BCE) requirements. It is particularly well suited for reducing the BCE work
order backlogs and accomplishing non-complex, construction requirements that are less than
750K and minimally designed up to 35%.
38. SEALED BIDS: Contracting by competitive bidding based on a firm requirement.
Bids
are take it or leave it;
negotiations are not allowed. This procedure includes the issuance of
formal IFBs followed by a public bid opening.
39. SIMPLIFIED ACQUISITION PROCEDURES: Purchases of supplies and services of less
than $150,000. Simplified negotiation procedures are allowed which significantly reduce
the lead time and cost of acquisition.
40.
SOLICITATION:
A request for vendors to submit a quote on required goods and services.
41.
STATEMENT OF WORK:
That portion of a contract describing the actual work to be done
by means of specifications or other minimum requirements, quantities, performance
date, and a statement of the requisite quality.
41
42.
SUPPLEMENTAL AGREEMENT:
Any contract modification that is accomplished by
mutual agreement of the contractor and the Contracting Officer (Bilateral
Agreement).
43.
TERMINATION:
The act and procedure of terminating (canceling) an active contract for
either convenience of the Government or for contractor default (breach of contract).
44.
VENDOR:
An individual, partnership, corporation, or other entity from which
goods/services are acquired in the performance of a contract.
45.
WARRANTY:
A promise or representation, either expressed or implied, regarding the
nature, usefulness, or condition of supplies, or performance of services.
46.
WARRANTED CONTRACTING OFFICER:
Any person who, in accordance with the FAR,
has the authority to enter into and administer contracts.
47.
WIDE AREA WORK FLOW:
An interactive web-based application that allows vendors
to electronically submit invoices and the Government to submit receiving reports, and to
inspect, accept, receive, and pay electronically
42
Attachment 1
COORDINATION CONTACTS
1. Civil Engineering 676-4385/1333
2. Fire Department 676-5738/1073
3. Communications 676-5579
4. Antiterrorism Officer 676-1352
5. Chief Information Protector 676-3514/2042
6. Manpower 676-6708
7. Transportation 676-2387
8. Hazardous Materials 676-7842 (Eydie Holland)
9. Library 676-6152 (Kathy Roseboom)
10. Medical Supply 676-7061 (1Lt Howard)
11. Construction 332s 676-1333 (Misty Roach)
12. Comm (Computer Items) 676-4273 (Jim Sims)
13. Comm (Telephone Items) 676-2243 (Robert Walton)
14. Comm (Video Equipment) 676-6885 (George Shaver)
15. PMEL 676-4411 (Mark White)
16. Contracting (Commercial Acq) 676-1604 (Chris Lamiroult)
17. Contracting (Formal Services) 676-3895 (Cecilia Murray)
18. Contracting (Construction) 676-6150 (Todd Raines)
19. LRS 676-1842 (Charlie Brown)
20. LRS (Supply) 676-8243 (Clara Bruce)
21. Fitness Director 676-0488 (Cindy Conn)
22. 80 FTW (BASH) 676-1003 (Capt Davidson)
23. DAPS DSN 884-2177 (Charles Knight)
24. TMO 676-2973 (David Shipman)
25. Training and Ed (Civ) 676-4845 (Louise Jones)