IN THE CIRCUIT COURT
FOR THE THIRD JUDICIAL CIRCUIT
MADISON COUNTY, ILLINOIS
JAMARCO HICKMAN, EVAN JENSEN,)
JADA WILLIAMS, and )
DEONTAE YANCEY )
)
Plaintiffs, ) Case No. 22-L-
)
vs. )
)
AMAZON.COM, INC., a corporation, )
AMAZON LOGISTICS, INC., a corporation )
CONTEGRA CONSTRUCTION COMPANY, )
LLC, a limited liability company, )
TRISTAR PROPERTIES, LLC, a limited )
liability company, )
STOCK & ASSOCIATES CONSULTING )
ENGINEERS, INC., a corporation, )
GRAY DESIGN GROUP, INC., )
a corporation, and )
MCNEALY ENGINEERING, INC., )
a corporation. )
)
Defendants. )
PLAINTIFFS’ ORIGINAL COMPLAINT
Plaintiffs, JAMARCO HICKMAN, EVAN JENSEN, JADA WILLIAMS, and
DEONTAE YANCEY (collectively “Plaintiffs”) in the above-entitled cause through their
attorneys, MILLER KING LAW FIRM, HILLIARD MARTINEZ GONZALES LLP, and BEN
CRUMP LAW PLLC against the following Defendants, AMAZON.COM, INC. (“AMAZON
INC.”), AMAZON LOGISTICS, INC (“ALI”), CONTEGRA CONSTRUCTION COMPANY,
LLC (“CONTEGRA”), TRISTAR PROPERTIES, LLC (“TRISTAR”), STOCK &
ASSOCIATES CONSULTING ENGINEERS, INC. (“STOCK”), GRAY DESIGN GROUP, INC.
(“GRAY”), and MCNEALY ENGINEERING, INC. (“MCNEALY”), and shows unto this
Honorable Court as follows:
I.
PLAINTIFFS
1. Plaintiff, Jamarco Hickman, is an individual who resides in Godfrey, Madison
County, Illinois. Plaintiff may be reached through the undersigned counsel.
2. Plaintiff, Evan Jensen, is an individual who resides in Alton, Madison County,
Illinois. Plaintiff may be reached through the undersigned counsel.
3. Plaintiff, Deontae Yancey, is an individual who resides in Godfrey, Madison
County, Illinois. Plaintiff may be reached through the undersigned counsel.
4. Plaintiff, Jada Williams, is an individual who resides in Glen Carbon, Madison
County, Illinois. Plaintiff may be reached through the undersigned counsel.
II.
DEFENDANTS
5. Defendant, AMAZON.COM, INC., is a Fortune 100 company headquartered in
Seattle, Washington. Defendant, AMAZON.COM, INC., and its subsidiaries (“AMAZON”,
“AMAZON FLEX”, “AMAZON.COM, LLC”, and Defendant, ALI) comprise the world’s
largest retailer.
6. In 2019, Amazon caused over 2.5 billion packages to be delivered throughout the
United States, including in Illinois. It is estimated that by the end of 2022, Amazon’s package
delivery volume could reach 6.5 billion packages per year in the United States.
7. Defendant, AMAZON.COM, INC., maintains, manages, and controls over 100
“fulfillment centers” and/or “delivery stations” in the United States. These “fulfillment centers”
and/or “delivery stations” are used to store, ship, and deliver goods that customers order through
the Amazon website, thereby creating a vast network by which Defendant, AMAZON, INC., can
provide the ordered goods to customers.
2
8. On December 10, 2021, and at all relevant times, Defendant, AMAZON INC.,
operated, maintained, controlled, and managed through its employees and/or agents a warehouse
or “delivery station” known as “DLI4” located in Edwardsville, Illinois.
9. In addition, on December 10, 2021, and at all relevant times, Defendant,
AMAZON INC., and AMAZON LOGISTICS, used a wide range of independently contracted
drivers and delivery carriers known as Delivery Service Partners (“DSPs”) to drive, haul, and
make deliveries for Defendants, AMAZON INC., and ALI.
10. The DSP program was carefully designed to allow Amazon and ALI to shift costs
and liabilities onto DSPs, while maintaining complete control over the DSPs’ day-to-day
operations, drivers, and potential for success. On information and belief, Amazon designed and
implemented the DSP program for the primary purpose of improperly evading employment laws,
labor and wage laws, transportation and logistics laws and regulations, motor vehicle negligence
liability exposure, and other legal responsibility arising from control over a vast army of delivery
drivers and massive fleet of delivery vans.
11. Namely, Amazon sought to interpose a layer of supposedly “independent”
business entities, DSPs, between itself and its drivers to act as a legal firewall between Amazon
and its employees. In reality, the DSPs themselves served as Amazon’s managerial employees
that hired and managed Amazon’s delivery drivers and ran Amazon’s delivery operations.
Through this sleight-of-hand, Amazon sought to disguise and deny employing and controlling
the operations of tens of thousands of delivery drivers while shifting all operational liability onto
hundreds of DSPs yet ensuring that Amazon, and not DSPs, would capture all the value created
by the DSPs and its other contractors’ hard work and labor.
12. Defendants, AMAZON.COM, INC. and AMAZON LOGISTICS, INC., will be
3
collectively referred to as Defendant AMAZON.
13. Defendant, CONTEGRA, is headquartered in Edwardsville, Illinois and maintains
members that are domiciled in Illinois. Defendant, CONTEGRA, is a construction and
development company that builds commercial retail buildings, warehouses, office buildings, and
institutions. Defendant, CONTEGRA, built, developed, and/or constructed DLI4. Defendant,
CONTEGRA, was under contract with Defendants, AMAZON INC., AMAZON LOGISTICS,
and/or TRISTAR, to build, develop and/or construct the subject warehouse.
14. Defendant, TRISTAR, is headquartered in Missouri. Defendant, TRISTAR, is a
developer, redeveloper, and real estate acquirer of industrial real estate. Defendant, TRISTAR,
was the developer of DLI4. Defendant, TRISTAR, was under contract with Defendants,
AMAZON INC., AMAZON LOGISTICS and/or CONTEGRA, to build, develop and/or
construct the subject warehouse located in Edwardsville, Illinois.
15. Defendant, STOCK, is a civil engineering and land surveying firm based in St.
Louis, Missouri. Defendant, STOCK, provided construction specifications, shop drawings, and
engineering specifications for the build of DLI4, including but not limited to construction
specifications, shop drawings, and engineering specifications to build the facility in a “tilt-up”
manner.
16. Defendant, GRAY, is headquartered in St. Louis, Missouri. Defendant GRAY
provides specialized design services, architectural, engineering, and related services. Defendant,
GRAY, joined Defendants, AMAZON.COM, INC., TRISTAR, CONTEGRA, and STOCK as the
master planning, design, and architectural firm for DLI4. Defendant, GRAY, was under contract
with Defendants, AMAZON.COM, INC., AMAZON LOGISTICS, INC., CONTEGRA,
TRISTAR, and/or STOCK, to design, develop, and/or construct the subject warehouse located in
4
Edwardsville, Illinois.
17. Defendant, MCNEALY ENGINEERING, INC., is a structural engineering firm
based in St. Louis, Missouri that provides architectural restoration, structural engineering, and
architectural engineering services including such services for the DLI4.
III.
JURISDICTION AND VENUE
18. This Court has jurisdiction over all of the parties and the subject matter involved
in this litigation as the amount in controversy exceeds the Court’s jurisdictional minimum
requirements.
19. Venue is proper in Madison County, Illinois because the incident giving rise to
this suit occurred in this County, pursuant to 735 ILCS 5/2-101.
20. Jurisdiction is proper in this Court over all Defendants as Defendants reside in or
conduct continuous and systematic business in the State of Illinois. Plaintiff expressly disavows
that any claims are being made pursuant to federal law, treaties, or constitution.
21. Although the amount in controversy exceeds $50,000.00, exclusive of costs and
interest, there is a lack of complete diversity because of the presence of a Plaintiff and one or
more of Defendants that are citizens of Illinois. As such, this case is not removable to Federal
Court. Any removal would be improper and should be remedied by sanctions and a remand with
an award of all costs, expenses, and fees including, but not limited to, attorney fees under 28
U.S.C. § 1447(c).
IV.
FACTS
A. A Deadly And Destructive Tornado Strikes Amazon’s DLI4 Fulfillment
Center.
1. On or about December 10, 2021, each Plaintiff was delivery driver for a DSP who
5
provided delivery services for Amazon. Plaintiffs’ delivery work was based out of Amazon’s
“DLI4” fulfillment center in Edwardsville, Illinois, delivering packages. As noted above,
Defendant Amazon is the owner, operator, and employer for the warehouse, and assumed the
duty and responsibility for ensuring safe operations for its employees.
2. That day, at approximately 8:20 p.m., an EF-3 tornado began on the south side of
Interstate 270 and moved northeast, striking DLI4, causing parts of the centers walls to collapse
and other multiple structure failures. Each Plaintiff was physically located at DLI4 when the
subject EF-3 tornado hit the warehouse and endured the destruction that the tornado unleashed at
the warehouse. Pivotally, as detailed below, each Plaintiff was physically located at the DLI4
Amazon fulfillment center during the tornado against their will.
3. Importantly, Defendant Amazon was warned by the National Weather Service of
possible tornadoes in the area of the warehouse as far as thirty-six (36) hours ahead of this tragic
incident. Upon receipt of these warnings, Defendant Amazon allegedly did not modify the
employee or contractor work schedule and refused to permit employees from taking time off
until the storm passed. On or about December 10, 2021, Defendant Amazon received additional
tornado warnings between 8:06 p.m. and 8:16 p.m. Defendant Amazon inadequately responded
by warning only a portion of the employees and instructing them to retreat into the warehouse
restrooms for safety. The tornado hit at roughly 8:26 p.m. that evening with 150 m.p.h. winds
which ripped off the roof of the warehouse and caused 11-inch-thick concrete walls to fall in on
themselves.
4. Tragically, due to Defendant Amazon’s blatant disregard for its employees’ and
contractors’ safety and well-being and motivated by profit and productivity at the expense of its
workers’ health, as well as the negligent and willful acts or omissions of Defendants
6
CONTEGRA, TRISTAR, STOCK, GRAY, and MCNEALY in building, developing, designing,
creating specifications for, and/constructing DLI4, numerous people were injured and at least six
(6) people lost their lives when the EF-3 tornado struck DLI4 on December 10, 2021. This
horrible tragedy was preventable, had basic and necessary care and concern for Defendant
Amazon’s workers been applied by Defendant Amazon, as it were legally obligated to do.
5. Unfortunately, this incident is only the latest in a pattern of Amazon disregarding
employee safety and ignoring warnings of oncoming natural disasters.
On or about September 2021, similar warehouses ran by Defendant Amazon ignored
similar warnings by the National Weather Service of the oncoming tropical depression
“Ida” which led to the deaths of fourteen (14) employees.
In 2021, when warned of widespread record-breaking high heatwaves over the summer of
that year, Defendant Amazon refused to take adequate measures which led to the
widespread employee health issues and the death of an employee within a similar
warehouse in Bessemer, Alabama.
On or about November 8, 2018, Defendant Amazon ignored warnings as a result of a
wildfire in California putting their employees at risk in the name of productivity and
profits.
In November 2018, Defendant Amazon had another warehouse that was struck by a
tornado in Baltimore, Maryland, that caused the warehouse to collapse and two (2) men
to die as a result.
B. Amazon’s Control Over DSP Drivers Like Plaintiffs
6. Amazon’s failure to protect Plaintiffs and others at the DLI4 fulfillment center is
magnified by the extent of control which Amazon exhibited over Plaintiffs’ work. Indeed,
7
Amazon closely monitored all materials aspects of Plaintiffs’ work and controlled, directed,
and/or instructed Plaintiffs on the operative details of their work, including but not limited to,
controlling the deliveries and the routes Plaintiffs followed. Illustrative examples of the extent of
Amazon’s control over Plaintiffs’ work include but are not limited to the below.
7. Defendant Amazon required Plaintiffs to wear a uniform and/or apparel that
displayed the name “Amazon” on it. Defendant Amazon provided DSP drivers with a $120 store
credit to Zappos.com to purchase work shoes.
8. The nature of the work performed by drivers was similar and standardized at each
Amazon delivery station and was centrally controlled and directed by Amazon.
9. Plaintiffs were also required to follow the policies and procedures of Defendant
Amazon, controlling the number of deliveries Plaintiffs made during a shift, monitoring and scoring work
performance, requiring Plaintiffs to share phone data, and having the means to terminate the employment
of Plaintiffs.
10. Amazon controlled the drivers’ day-to-day activities through direct contact with
them.
11. Amazon set the delivery routes and then assigned and provided them to its DSPs.
Every week, Amazon sent the DSPs the number, type, and start time for the delivery routes for
the upcoming week.
12. DSP drivers were each assigned a cell phone loaded with proprietary Amazon
delivery software (“Amazon Flex”) and drove an Amazon-branded vehicle to the Amazon
delivery station, where Amazon employees pre-sorted packages for delivery. Drivers then logged
into Amazon Flex to access their Amazon assigned route and picked up the assigned packages.
The packages were not transformed or modified during the shipping process but were delivered
8
in the same condition as they were shipped to the Amazon delivery station.
13. Amazon, through a proprietary system called Cortex, tracked, and monitored the
DSP drivers’ job performance in real time, tracking delivery rate, delivery speed, delivery
accuracy, driver distractions, seatbelt use, driving speed and acceleration, and adherence to a
delivery schedule created by Amazon through Amazon Flex and its EMentor application. Every
day, Amazon sent an email to the DSPs documenting each delivery drivers job performance.
14. Amazon required DSP drivers to explain why any package was returned to the
station at the end of a drivers shift. Amazon routinely threatened drivers with suspension or
termination if they did not go back out to attempt redelivery of 100% of dispatched packages,
even if the driver had been on the road more than ten hours.
15. Amazon set the start time and end time for drivers and dictated the hours of
delivery in which a delivery driver could deliver a package, including the start time and end time
for each route. For example, Amazon employees sent delivery drivers text messages when they
approached ten hours of work.
16. Amazon employees also direct DSP employees to cease delivering or to continue
delivering. On more than one occasion, DSP drivers were called back to the delivery station and
told not to deliver packages well before the drivers’ shifts had ended.
C. Plaintiffs At DLI4 Against Their Will When Storm Hits.
17. Plaintiff Evan Jensen was employed by XSeed, Inc., an Amazon DSP contractor,
for approximately six months prior to the tornado. Plaintiff Jensen was provided an Amazon
truck equipped with a 4-way camera and an Amazon uniform. On December 10, 2021, Mr.
Jensen’s shift was scheduled between 9:00 a.m. and 8:30 p.m.
18. At approximately 7:00 p.m., Mr. Jensen sent a text message to his manager
9
requesting to return to the warehouse. Following such approval, Mr. Jensen arrived at DLI4 at
approximately 8:00 p.m. Mr. Jensen attempted to leave the warehouse to return home before the
storm hit but was threatened with termination by a warehouse official if he left the warehouse.
The storm hit around 8:30 p.m.
19. Fearful of termination, Mr. Jensen remained in the warehouse and was directed to
take shelter in the warehouse break room at the time of the storm. Upon information and belief,
Plaintiff Jenson believes he would have made it to his personal residence if he would have been
allowed to leave the warehouse when he first texted his manager around 7:00 p.m.
20. Plaintiff Jada Williams was employed by XSeed, Inc., an Amazon DSP
contractor, for approximately two weeks prior to the tornado. Plaintiff Williams was provided an
Amazon truck equipped with a 4-way camera and an Amazon uniform. On December 10, 2021,
Ms. Williams’ shift was scheduled between 9:00 a.m. and 8:30 p.m.
21. Ms. Williams was directed to take shelter in a bathroom on the north end of the
warehouse at the time of the storm. Ms. Williams attempted to leave the warehouse to return
home before the storm hit but was threatened with termination by a warehouse official if she left
the warehouse.
22. Plaintiff Deontae Yancey was employed by XSeed, Inc., an Amazon DSP
contractor, for approximately three months prior to the tornado. Plaintiff was provided an
Amazon truck equipped with a 4-way camera and an Amazon uniform. On December 10, 2021,
Ms. Williams’ shift was scheduled between 10:00 a.m. and 9:00 p.m.
23. Defendant Amazon would require its drivers to “rescue” fellow drivers when
other drivers had not completed their scheduled deliveries. To “rescue” another driver means to
go out and help them finish delivering their packages.
10
24. National Weather Service alerts covering St. Louis County and Madison County,
including Edwardsville, were issued via Twitter at 6:17 p.m.:
25. At 6:32 p.m., Mr. Yancey was nearly finished with his delivery route when he
received a message from Nikita Sunil via the Amazon Flex App requesting that he rescue a
fellow driver.
11
26. Fearful of the approaching storm, Mr. Yancey refused to participate in the rescue.
27. When Mr. Yancey returned to the warehouse, he was directed to take shelter in a
bathroom on the north end of the warehouse at the time of the storm. Mr. Yancey attempted to
leave the warehouse to return home before the storm, however, he was told to “stay put and not
to leave” by warehouse officials.
28. Plaintiff Jamarco Hickman was employed by ABC & DAD, Inc., an Amazon DSP
contractor, for approximately four months prior to the collapse of the warehouse. Plaintiff
Hickman was provided an Amazon truck equipped with a 4-way camera and an Amazon
uniform. On December 10, 2021, Mr. Hickman’s shift was scheduled between 9:30 a.m. and 8:30
p.m.
29. On Thursday, December 9, 2021, a team huddle was conducted in the warehouse
staging area inside of the delivery garage wherein the dispatch manager announced that Amazon
wanted more drivers on the road because of the holiday peak season so drivers were expected to
begin normally scheduled shifts one hour earlier than their scheduled shift. During this meeting,
the dispatcher manager also announced a peak season incentive program, wherein drivers could
earn a $20 Amazon gift card for delivering 200 additional packages per day.
12
30. On December 10, 2021, at approximately 7:40 p.m., Mr. Hickman finished a
rescue of a fellow driver. He called dispatch and requested permission to return to the warehouse
to turn in his truck and complete his shift. He noticed the sky was becoming increasingly dark so
he hurriedly returned to the warehouse so that he could gather his belongings and return home.
31. Mr. Hickman returned to the DLI4 warehouse at approximately 8:15 p.m. He was
immediately instructed to park his delivery van and go to the restrooms for shelter where he
remained until emergency medical services arrived following the storm.
32. On and before December 10, 2021, Defendant Amazon employed an individual
and/or individuals at the subject Amazon fulfillment center that were responsible for monitoring
severe weather updates.
33. On December 10, 2021, Defendant Amazon, knew or should have known that
tornadoes were possible at or near the subject “fulfillment center” as early as 3:44 a.m. on
Thursday, December 9, 2021, when the National Weather Service issued the following weather
warning: There is chance of thunderstorms late Friday afternoon into the night across
southeastern and east-central Missouri as well as south-central and southwestern Illinois. A few
thunderstorms could become strong to severe in southeastern Missouri and southwestern Illinois
late Friday evening into night. The main threat will be strong to damage wind gusts, but a
tornado is also possible.
34. On December 10, 2021, Defendant Amazon, again knew or should have known
that tornadoes were possible at or near the subject “fulfillment center” when the National
Weather Service on December 9, 2021 at 2:58 p.m. reported: Scattered severe storms are
possible across southeast Missouri and southwest Illinois between 8:00 p.m. Friday night and
3:00 a.m. early Saturday. Any storms that develop will be fast moving. The primary threat with
13
these storms will be damaging winds. A few tornadoes will be possible as well.
D. Amazon’s Knowledge Of The Tornado And Its Severity.
35. On December 10, 2021 at 8:06 p.m., the National Weather Service issued a “take
shelter now” tornado warning for the Edwardsville, Illinois area.
36. Despite having numerous warnings from the National Weather Service that the
Edwardsville, Illinois area was at risk of experiencing devastating weather and/or tornadoes,
Defendant Amazon had workers and independently contracted Delivery Service Partners
(“DSP”) working during a holiday “peak season” until moments before the EF-3’s tornado
obliterated the subject fulfillment center in Edwardsville, Illinois.
37. At all times on December 10, 2021, Defendant Amazon, knew or should have
known and foreseen that the subject fulfillment center was in an area that could sustain
devastating weather and/or a tornado.
38. On December 10, 2021 and at all relevant times, Defendant Amazon, had duties
to exercise reasonable care in its operation, management, and/or control of the subject fulfillment
center and all workers present at the center, including but not limited to, independently
contracted DSP contractors including Plaintiffs, to prevent them from sustaining injuries and
death.
39. Plaintiffs attach as “Exhibit A” to this Complaint the West County EMA & Fire
Protection District’s Report authored by Dan Bruno, P.E., PTOE, to further support Plaintiffs’
causes of action against Defendants.
40. As stated by Mr. Bruno, “…I found what I believed to be one or more significant
structural issues with the Amazon building that may have contributed to the failure of the
structure.” See Exhibit A at 4. Shockingly, Mr. Bruno discovered why these columns failed and
14
caused the death of these six (6) individuals:
“In each case of the failed columns, there was a clear line of demarcation on the
bottom of the column just below the yellow band that showed an area of
unpainted column with light brown surface oxidation that had been the area of the
column that sat below the finished grade of the concrete floor. I became
concerned when I noticed that none of the columns appeared to be ripped or torn
from the base. This was especially concerning to me knowing that the
International Building Code (IBC) requires structural members to be secured
against uplift from wind loads, among other things. (2021 IBC Section 1604.8.1).
Looking at the base of the columns more closely, I could find no weld or bolted
connection at the base of any column, but only a bead of what appeared to be
some sort of caulk around the column at the finished floor line. An examination of
several of the empty pockets where [sic] columns once stood also did not reveal
any indication of positive securement of the column et at or below the finished
floor level.”
See Exhibit A at 2.
41. As a result of Defendants’ negligence and continuous blatant disregard for the
health and safety of their workers, Plaintiffs suffered life-altering injuries and damages.
COUNTS
COUNT I: NEGLIGENT INFLICTION OF EMOTIONAL DISTRESS (NIED):
AMAZON DEFENDANTS
1. Plaintiffs incorporate and re-allege each of the paragraphs as set for above as
though fully set forth herein.
2. Plaintiffs suffered physically and psychologically from direct impact of
Defendants’ negligence.
3. At all times mentioned herein, Defendant Amazon owed duties to Plaintiffs,
including but not limited to the following and, by various acts and omissions, breached these
duties, each of which singularly or in combination, was the proximate cause of the occurrence in
question and Plaintiffs’ injuries and damages:
a. Failing to warn about or abate known safety risks and hazards;
b. Failing to provide proper, safe equipment, and competent personnel;
15
c. Failing to design an adequate safety plan and provide adequate personnel to
execute the safety plan;
d. Failing to have a basement shelter or actual shelter;
e. Failing to implement proper safety procedures in the event of an evacuation or
natural disaster;
f. Failing to follow safety procedures while the natural disaster was unfolding;
g. Failing to properly monitor inclement weather prior to the tornado hitting the
fulfillment center;
h. Failing to operate, maintain, and manage a warehouse in an area prone to
tornadoes that was built to withstand tornado size gusts;
i. Failing to ensure that Plaintiffs were in the safest place in the fulfillment
center when the tornado touched ground;
j. Failing to have a proper Emergency Action Plan meeting the requirements of
OSHA 29 CFR 1910.38;
k. Failing to train employees and contractors how to follow an Emergency
Action Plan;
l. Failing to review an Emergency Action Plan with each individual per OSHA
1910.38(e);
m. Failing to have a proper alarm/warning in place at the subject fulfillment
center per OSHA 1910.38(d) and 1910.165 to warn of the approaching
tornado;
n. Requiring Plaintiffs to continue working until the moments before the tornado
struck when Amazon knew or should have known the tornado was imminent;
o. Failing to hold safety meetings with individuals, including Plaintiffs, in
advance of December 10, 2021, to prepare individuals on the safest course of
action to take if a tornado is imminent;
p. Failing to timely inform individuals at the subject fulfillment center that a
tornado was approaching so those individuals had adequate time to properly
shelter or evacuate;
q. Failing to evacuate all those present at the subject delivery station when
Amazon knew or should have known that keeping individuals working at the
16
center, including Plaintiffs, placed them in imminent danger when Amazon
knew or should have known the area was at-risk of a tornado;
r. Failing to operate, maintain and manage a warehouse in an area prone to
tornadoes that was equipped with a “safe room” consistent with FEMA P-321
and FEMA P-361;
s. Failing to operate, maintain and manage a warehouse in an area prone to
tornadoes that was equipped with a “best available refugee area” consistent
with FEMA P-431;
t. Failing to operate, maintain and manage a warehouse in an area prone to
tornadoes that was built to withstand tornado size gusts;
u. Failing to have a qualified architect or engineer designate the “bast available
refugee area” per FEMA P-431;
v. Failing to provide a warehouse that was built in compliance with International
Building Code Section 1604; and
w. Was otherwise carless and negligent.
4. Such acts would cause distress in any reasonable person and in fact were the
direct, proximate, and foreseeable cause of the mental anguish and severe emotional distress in
Plaintiffs.
5. The acts and omissions of Defendant Amazon as described above constitute
negligence, and Defendant Amazon’s breaches of its legal duty proximately caused injury and
damages to Plaintiffs. Defendant Amazon breached its duty, failed to exercise reasonable care
and such failure proximately caused the occurrence in question.
6. Defendant Amazon is liable under the doctrine of respondeat superior for the
individuals responsible for ensuring employee safety as they were acting in the capacity as an
agent, servant, and/or employee of Defendant Amazon, and were acting within the course and
scope of its authority as such. There, the doctrine of Respondent Superior should be applied to
Defendant Amazon as follows:
17
a. negligent hiring;
b. negligent entrustment;
c. negligent training and safety implementation; and
d. negligent retention.
7. Defendant Amazon acted willfully, recklessly, and with conscious disregard for or
with deliberate indifference towards Plaintiffs’ well-being and Plaintiffs are entitled to recover
punitive damages in such amount as will sufficiently punish Defendant Amazon and as will serve
as an example to prevent repetition of such conduct in the future.
8. As a direct and proximate cause of one or more of the aforementioned careless
negligent acts and/or omissions of Defendant Amazon, Plaintiffs incurred devastating physical
and emotional injuries that they will suffer from for the rest of their lives.
9. As a direct and proximate result of Defendant Amazon’s intentional and reckless
acts, omissions and inactions, Plaintiffs suffered economic harm, including but not limited to:
loss of past and future pay and benefits; loss of career opportunities; loss of future earnings and
other incidentals, loss of benefits of employment, and severe emotional distress, including but
not limited to: loss of self-esteem; difficulty in forming other relationships; mental anguish;
emotional trauma; physical harm; grief; shame; embarrassment; anger; overwhelming sense of
injustice; paranoia, fear, disappointment; insomnia; anxiety; nervousness; worry; and depression.
Plaintiffs have suffered a loss of enjoyment of a normal life because of their emotional injuries
and has lost their ability to engage in the same kinds of normal activities, all to their damages.
WHEREFORE, Plaintiffs pray for judgment against Defendants AMAZON.COM, INC.
and AMAZON LOGISTICS, INC. in an amount in excess of Fifty-Thousand Dollars
($50,000.00).
COUNT II: NEID: CONTEGRA CONSTRUCTION COMPANY, LLC
1. Plaintiff re-alleges Paragraphs 1-41 of Section IV for Paragraph 1 of Count II.
18
2. On and before December 10, 2021, Defendant Contegra was a construction and
development company that built commercial retail buildings, warehouses, office buildings, and
institutions.
3. Prior to December 10, 2021, Defendant Contegra built, developed, and/or
constructed an Amazon “delivery station” known as “DLI4” located in Edwardsville, Illinois.
Defendant Contegra was under contract with Defendants, Amazon Inc., Amazon Logistics, Inc.,
and/or Tristar, to build, develop and/or construct the subject warehouse.
4. Prior to December 10, 2021 and during all phases of the construction of the
subject warehouse, Defendant, Contegra, individually and through its agents, servants, and/or
employees was present during the course of such construction and Defendant, Contegra,
participated, orchestrated, managed, supervised, controlled, directed, and/or was in charge of the
work being done at the aforesaid project including but not limited to directing the means,
methods and operative details of the work being done by on-site workers, including but not
limited to workers of Defendant, Tristar. The Defendant, Contegra, individually and through its
agents, servants, and/or employees participated in coordinating the work being done and
designated various work methods, had a responsibility to maintain a safe premise for all workers,
maintained and checked work progress, and participated in the scheduling of the work and
inspection of the work.
5. That at all relevant times, Defendant Contegra had a duty to exercise reasonable
care in its build, planning, and construction of the subject “delivery station” located in
Edwardsville, Illinois.
6. Notwithstanding its duties, at said time and place, Defendant Contegra by and
through its agents, servants, and employees, was then and there guilty of one or more of the
19
following careless and negligent acts and/or omissions:
a. Built and/or constructed the subject “delivery station” without a basement or
actual shelter that could provide shelter when Defendant knew that
Edwardsville, Illinois was prone to inclement weather including but not
limited to tornadoes;
b. Built and/or constructed the subject “delivery station” without a “safe room”
that could provide shelter when Defendant knew that Edwardsville, Illinois
was prone to inclement weather including but not limited to tornadoes;
c. Failed to recommend that the subject “delivery station” be built with a
basement shelter, shelter or “safe room” that could provide shelter when
Defendant knew that Edwardsville, Illinois was prone to inclement, severe
weather and/or tornadoes;
d. Built and/or constructed the subject “delivery station” in a “tilt-up” wall
construction manner when Defendant knew or should have known that this
manner of construction causes walls to fall when struck with high winds and
knew that Edwardsville, Illinois was prone to inclement, severe weather and
tornadoes;
e. Failed to adequately build the subject “delivery station” in a manner to
prevent walls from collapsing and the roof from separating when struck with
high winds when Defendant knew that Edwardsville, Illinois was prone to
inclement, severe weather and tornadoes;
f. Failed to build the subject “delivery station” pursuant to all local, state, and
federal codes that prevented structural collapse due to inclement weather;
g. Failed to provide a warehouse that was built in compliance with International
Building Code Section 1604;
h. Was otherwise careless and negligent.
7. Such acts would cause distress in any reasonable person and in fact were the
direct, proximate, and foreseeable cause of the mental anguish and severe emotional distress in
Plaintiffs.
10. Defendant Contegra is liable under the doctrine of respondeat superior for the
individuals responsible for ensuring employee safety as they were acting in the capacity as an
agent, servant, and/or employee of Defendant Contegra, and were acting within the course and
20
scope of its authority as such. There, the doctrine of Respondent Superior should be applied to
Defendant Contegra as follows:
a. negligent hiring;
b. negligent entrustment;
c. negligent training and safety implementation; and
d. negligent retention.
11. Defendant Contegra acted willfully, recklessly, with conscious disregard for or
with deliberate indifference towards, Plaintiffs’ well-being and Plaintiffs are entitled to recover
punitive damages in such amount as will sufficiently punish Defendant Contegra and as will
serve as an example to prevent repetition of such conduct in the future.
12. As a direct and proximate cause of one or more of the aforementioned careless
negligent acts and/or omissions of Defendant Contegra, the Plaintiffs suffered devastating
physical and emotional injuries that they will suffer from for the rest of their lives.
13. As a direct and proximate result of Defendant Contegra’s intentional and reckless
acts, omissions and inactions, Plaintiffs suffered economic harm, including but not limited to:
loss of past and future pay and benefits; loss of career opportunities; loss of future earnings and
other incidentals, loss of benefits of employment, and severe emotional distress, including but
not limited to: loss of self-esteem; difficulty in forming other relationships; mental anguish;
emotional trauma; physical harm; grief; shame; embarrassment; anger; overwhelming sense of
injustice; paranoia, fear, disappointment; insomnia; anxiety; nervousness; worry; and depression.
Plaintiffs has suffered a loss of enjoyment of a normal life because of their physical and
emotional injuries and has lost their ability to engage in the same kinds of normal activities, all to
their damages.
WHEREFORE, Plaintiffs pray for judgment against Defendant, Contegra Construction
Company, LLC, in an amount in excess of Fifty-Thousand Dollars ($50,000.00).
21
COUNT III: NEID: TRISTAR PROPERTIES, LLC
1. Plaintiffs re-allege Paragraphs 1-41 of Section IV for Paragraph 1 of Count III.
2. On and before December 10, 2021, Defendant Tristar was a construction and
development company that builds commercial retail buildings, warehouses, office buildings, and
institutions.
3. Prior to December 10, 2021, Defendant Tristar built, developed, and/or
constructed an Amazon “delivery station” known as “DLI4” located in Edwardsville, Illinois.
4. Defendant Tristar was under contract with Defendants, Amazon Inc., Amazon
Logistics, and/or Contegra, to build, develop, and/or construct the subject warehouse.
5. Prior to December 10, 2021 and during all phases of the construction of the
subject warehouse, Defendant Tristar individually and through its agents, servants, and/or
employees was present during the course of such construction and Defendant Tristar
participated, orchestrated, managed, supervised, controlled, directed, and/or was in charge of the
work being done at the aforesaid project including but not limited to directing the means,
methods and operative details of the work being done by on-site workers, including but not
limited to workers of Defendant, Tristar. Defendant Tristar individually and through its agents,
servants, and/or employees participated in coordinating the work being done and designated
various work methods, had a responsibility to maintain a safe premise for all workers,
maintained and checked work progress, and participated in the scheduling of the work and
inspection of the work.
6. That at all relevant times, Defendant Tristar had a duty to exercise reasonable
care in its build, planning, and construction of the subject “delivery station” located in
Edwardsville, Illinois.
22
7. Notwithstanding its duties, at said time and place, Defendant Tristar by and
through its agents, servants, and employees, was then and there guilty of one or more of the
following careless and negligent acts and/or omissions:
a. Built and/or constructed the subject “delivery station” without a basement or
actual shelter that could provide shelter when Defendant knew that
Edwardsville, Illinois was prone to inclement weather including but not
limited to tornadoes;
b. Built and/or constructed the subject “delivery station” without a “safe room”
that could provide shelter when Defendant knew that Edwardsville, Illinois
was prone to inclement weather including but not limited to tornadoes;
c. Failed to recommend that the subject “delivery station” be built with a
basement shelter, shelter or “safe room” that could provide shelter when
Defendant knew that Edwardsville, Illinois was prone to inclement, severe
weather and/or tornadoes;
d. Built and/or constructed the subject “delivery station” in a “tilt-up” wall
construction manner when Defendant knew or should have known that this
manner of construction causes walls to fall when struck with high winds and
knew that Edwardsville, Illinois was prone to inclement, severe weather and
tornadoes;
e. Failed to adequately build the subject “delivery station” in a manner to
prevent walls from collapsing and the roof from separating when struck with
high winds when Defendant knew that Edwardsville, Illinois was prone to
inclement, severe weather and tornadoes;
f. Failed to build the subject “delivery station” pursuant to all local, state, and
federal codes that prevented structural collapse due to inclement weather;
g. Failed to provide a warehouse that was built in compliance with International
Building Code Section 1604; and
h. Was otherwise careless and negligent.
8. Such acts would cause distress in any reasonable person and in fact were the
direct, proximate, and foreseeable cause of the mental anguish and severe emotional distress in
Plaintiffs.
9. Defendant Tristar is liable under the doctrine of respondeat superior for the
23
individuals responsible for ensuring employee safety as they were acting in the capacity as an
agent, servant, and/or employee of Defendant Tristar, and were acting within the course and
scope of its authority as such. There, the doctrine of Respondent Superior should be applied to
Defendant Tristar as follows:
a. negligent hiring;
b. negligent entrustment;
c. negligent training and safety implementation; and
d. negligent retention.
10. Defendant Tristar acted willfully, recklessly, with conscious disregard for or with
deliberate indifference towards, Plaintiffs’ well-being and Plaintiffs are entitled to recover
punitive damages in such amount as will sufficiently punish Defendant Tristar and as will serve
as an example to prevent repetition of such conduct in the future.
11. As a direct and proximate cause of one or more of the aforementioned careless
negligent acts and/or omissions of Defendant Tristar, the Plaintiffs suffered devastating physical
and emotional injuries that they will suffer from for the rest of their lives.
12. As a direct and proximate result of Defendant Tristar’s intentional and reckless
acts, omissions and inactions, Plaintiffs suffered economic harm, including but not limited to:
loss of past and future pay and benefits; loss of career opportunities; loss of future earnings and
other incidentals, loss of benefits of employment, and severe emotional distress, including but
not limited to: loss of self-esteem; difficulty in forming other relationships; mental anguish;
emotional trauma; physical harm; grief; shame; embarrassment; anger; overwhelming sense of
injustice; paranoia, fear, disappointment; insomnia; anxiety; nervousness; worry; and depression.
Plaintiffs has suffered a loss of enjoyment of a normal life because of their physical and
emotional injuries and has lost their ability to engage in the same kinds of normal activities, all to
their damages.
24
WHEREFORE, Plaintiffs pray for judgment against Defendant, Tristar Properties, LLC,
in an amount in excess of Fifty-Thousand Dollars ($50,000.00).
COUNT IV: NEID: STOCK & ASSOCIATES CONSULTING ENGINEERS, INC.
1. Plaintiffs re-allege Paragraphs 1-41 of Section IV for Paragraph 1 of Count IV.
2. On and before December 10, 2021, Defendant Stock was a construction and
development company that builds commercial retail buildings, warehouses, office buildings, and
institutions.
3. Prior to December 10, 2021, Defendant Stock built, developed, and/or constructed
an Amazon “delivery station” known as “DLI4” located in Edwardsville, Illinois.
4. Defendant Stock was under contract with Defendants, Amazon Inc., Amazon
Logistics, and/or Contegra, to build, develop, and/or construct the subject warehouse.
5. Prior to December 10, 2021 and during all phases of the construction of the
subject warehouse, Defendant Stock individually and through its agents, servants, and/or
employees was present during the course of such construction and Defendant Stock
participated, orchestrated, managed, supervised, controlled, directed, and/or was in charge of the
work being done at the aforesaid project including but not limited to directing the means,
methods and operative details of the work being done by on-site workers, including but not
limited to workers of Defendant, Stock. Defendant Stock individually and through its agents,
servants, and/or employees participated in coordinating the work being done and designated
various work methods, had a responsibility to maintain a safe premise for all workers,
maintained and checked work progress, and participated in the scheduling of the work and
inspection of the work.
6. That at all relevant times, Defendant Stock had a duty to exercise reasonable
25
care in its build, planning, and construction of the subject “delivery station” located in
Edwardsville, Illinois.
7. Notwithstanding its duties, at said time and place, Defendant Stock by and
through its agents, servants, and employees, was then and there guilty of one or more of the
following careless and negligent acts and/or omissions:
a. Built and/or constructed the subject “delivery station” without a basement or
actual shelter that could provide shelter when Defendant knew that
Edwardsville, Illinois was prone to inclement weather including but not
limited to tornadoes;
b. Built and/or constructed the subject “delivery station” without a “safe room”
that could provide shelter when Defendant knew that Edwardsville, Illinois
was prone to inclement weather including but not limited to tornadoes;
c. Failed to recommend that the subject “delivery station” be built with a
basement shelter, shelter or “safe room” that could provide shelter when
Defendant knew that Edwardsville, Illinois was prone to inclement, severe
weather and/or tornadoes;
d. Built and/or constructed the subject “delivery station” in a “tilt-up” wall
construction manner when Defendant knew or should have known that this
manner of construction causes walls to fall when struck with high winds and
knew that Edwardsville, Illinois was prone to inclement, severe weather and
tornadoes;
e. Failed to adequately build the subject “delivery station” in a manner to
prevent walls from collapsing and the roof from separating when struck with
high winds when Defendant knew that Edwardsville, Illinois was prone to
inclement, severe weather and tornadoes;
f. Failed to build the subject “delivery station” pursuant to all local, state, and
federal codes that prevented structural collapse due to inclement weather;
g. Failed to provide a warehouse that was built in compliance with International
Building Code Section 1604; and
h. Was otherwise careless and negligent.
8. Such acts would cause distress in any reasonable person and in fact were the
direct, proximate, and foreseeable cause of the mental anguish and severe emotional distress in
26
Plaintiffs.
9. Defendant Stock is liable under the doctrine of respondeat superior for the
individuals responsible for ensuring employee safety as they were acting in the capacity as an
agent, servant, and/or employee of Defendant Stock, and were acting within the course and scope
of its authority as such. There, the doctrine of Respondent Superior should be applied to
Defendant Stock as follows:
a. negligent hiring;
b. negligent entrustment;
c. negligent training and safety implementation; and
d. negligent retention.
10. Defendant Stock acted willfully, recklessly, with conscious disregard for or with
deliberate indifference towards, Plaintiffs’ well-being and Plaintiffs are entitled to recover
punitive damages in such amount as will sufficiently punish Defendant Stock and as will serve as
an example to prevent repetition of such conduct in the future.
11. As a direct and proximate cause of one or more of the aforementioned careless
negligent acts and/or omissions of Defendant Stock, the Plaintiffs suffered devastating physical
and emotional injuries that they will suffer from for the rest of their lives.
12. As a direct and proximate result of Defendant Stock’s intentional and reckless
acts, omissions and inactions, Plaintiffs suffered economic harm, including but not limited to:
loss of past and future pay and benefits; loss of career opportunities; loss of future earnings and
other incidentals, loss of benefits of employment, and severe emotional distress, including but
not limited to: loss of self-esteem; difficulty in forming other relationships; mental anguish;
emotional trauma; physical harm; grief; shame; embarrassment; anger; overwhelming sense of
injustice; paranoia, fear, disappointment; insomnia; anxiety; nervousness; worry; and depression.
Plaintiffs has suffered a loss of enjoyment of a normal life because of their physical and
27
emotional injuries and has lost their ability to engage in the same kinds of normal activities, all to
their damages.
WHEREFORE, Plaintiffs pray for judgment against Defendant, Stock & Associates
Consulting Engineers, Inc., in an amount in excess of Fifty-Thousand Dollars ($50,000.00).
COUNT V: NEID: GRAY DESIGN GROUP, INC.
1. Plaintiffs re-allege Paragraphs 1-41 of Section IV for Paragraph 1 of Count V.
2. On and before December 10, 2021, Defendant Gray was a construction and
development company that builds commercial retail buildings, warehouses, office buildings, and
institutions.
3. Prior to December 10, 2021, Defendant Gray built, developed, and/or constructed
an Amazon “delivery station” known as “DLI4” located in Edwardsville, Illinois.
4. Defendant Gray was under contract with Defendants, Amazon Inc., Amazon
Logistics, and/or Contegra, to build, develop, and/or construct the subject warehouse.
5. Prior to December 10, 2021 and during all phases of the construction of the
subject warehouse, Defendant Gray individually and through its agents, servants, and/or
employees was present during the course of such construction and Defendant Gray participated,
orchestrated, managed, supervised, controlled, directed, and/or was in charge of the work being
done at the aforesaid project including but not limited to directing the means, methods and
operative details of the work being done by on-site workers, including but not limited to workers
of Defendant, Gray. Defendant Gray individually and through its agents, servants, and/or
employees participated in coordinating the work being done and designated various work
methods, had a responsibility to maintain a safe premise for all workers, maintained and checked
work progress, and participated in the scheduling of the work and inspection of the work.
28
6. That at all relevant times, Defendant Gray had a duty to exercise reasonable care
in its build, planning, and construction of the subject “delivery station” located in Edwardsville,
Illinois.
7. Notwithstanding its duties, at said time and place, Defendant Gray by and through
its agents, servants, and employees, was then and there guilty of one or more of the following
careless and negligent acts and/or omissions:
a. Built and/or constructed the subject “delivery station” without a basement or
actual shelter that could provide shelter when Defendant knew that
Edwardsville, Illinois was prone to inclement weather including but not
limited to tornadoes;
b. Built and/or constructed the subject “delivery station” without a “safe room”
that could provide shelter when Defendant knew that Edwardsville, Illinois
was prone to inclement weather including but not limited to tornadoes;
c. Failed to recommend that the subject “delivery station” be built with a
basement shelter, shelter or “safe room” that could provide shelter when
Defendant knew that Edwardsville, Illinois was prone to inclement, severe
weather and/or tornadoes;
d. Built and/or constructed the subject “delivery station” in a “tilt-up” wall
construction manner when Defendant knew or should have known that this
manner of construction causes walls to fall when struck with high winds and
knew that Edwardsville, Illinois was prone to inclement, severe weather and
tornadoes;
e. Failed to adequately build the subject “delivery station” in a manner to
prevent walls from collapsing and the roof from separating when struck with
high winds when Defendant knew that Edwardsville, Illinois was prone to
inclement, severe weather and tornadoes;
f. Failed to build the subject “delivery station” pursuant to all local, state, and
federal codes that prevented structural collapse due to inclement weather;
g. Failed to provide a warehouse that was built in compliance with International
Building Code Section 1604; and
h. Was otherwise careless and negligent.
8. Such acts would cause distress in any reasonable person and in fact were the
29
direct, proximate, and foreseeable cause of the mental anguish and severe emotional distress in
Plaintiffs.
9. Defendant Gray is liable under the doctrine of respondeat superior for the
individuals responsible for ensuring employee safety as they were acting in the capacity as an
agent, servant, and/or employee of Defendant Gray, and were acting within the course and scope
of its authority as such. There, the doctrine of Respondent Superior should be applied to
Defendant Gray as follows:
a. negligent hiring;
b. negligent entrustment;
c. negligent training and safety implementation; and
d. negligent retention.
10. Defendant Gray acted willfully, recklessly, with conscious disregard for or with
deliberate indifference towards, Plaintiffs’ well-being and Plaintiffs are entitled to recover
punitive damages in such amount as will sufficiently punish Defendant Gray and as will serve as
an example to prevent repetition of such conduct in the future.
11. As a direct and proximate cause of one or more of the aforementioned careless
negligent acts and/or omissions of Defendant Gray, the Plaintiffs suffered devastating physical
and emotional injuries that they will suffer from for the rest of their lives.
12. As a direct and proximate result of Defendant Gray’s intentional and reckless acts,
omissions and inactions, Plaintiffs suffered economic harm, including but not limited to: loss of
past and future pay and benefits; loss of career opportunities; loss of future earnings and other
incidentals, loss of benefits of employment, and severe emotional distress, including but not
limited to: loss of self-esteem; difficulty in forming other relationships; mental anguish;
emotional trauma; physical harm; grief; shame; embarrassment; anger; overwhelming sense of
injustice; paranoia, fear, disappointment; insomnia; anxiety; nervousness; worry; and depression.
30
Plaintiffs has suffered a loss of enjoyment of a normal life because of their physical and
emotional injuries and has lost their ability to engage in the same kinds of normal activities, all to
their damages.
WHEREFORE, Plaintiffs pray for judgment against Defendant, Gray Design Group, Inc.,
in an amount in excess of Fifty-Thousand Dollars ($50,000.00).
COUNT VI: NEID: MCNEALY ENGINEERING, INC.
1. Plaintiffs re-allege Paragraphs 1-41 of Section IV for Paragraph 1 of Count VI.
2. On and before December 10, 2021, Defendant McNealy was a structural
engineering firm based in St. Louis, Missouri that provides architectural restoration, structural
engineering, and architectural engineering services including such services for the subject
“delivery station” known as DLI4 in Edwardsville, Illinois.
3. Prior to December 10, 2021, Defendant McNealy built, developed, provided
architectural services, structural engineering services, and/or constructed the Amazon “delivery
station” known as “DLI4” located in Edwardsville, Illinois. Defendant McNealy was under
contract with Defendants, Amazon.com, Inc., Amazon Logistics, Tristar, Stock, Gray and/or
Contegra, to assist in the build, develop and/or construct the subject warehouse.
4. Defendant McNealy was under contract with Defendants, Amazon.com, Inc.,
Amazon Logistics, Tristar, Stock, Gray and/or Contegra, to assist in the build, develop and/or
construct the subject warehouse.
5. Prior to December 10, 2021 and during all phases of the construction of the
subject warehouse, Defendant McNealy individually and through its agents, servants, and/or
employees was present during the course of such construction and Defendant McNealy
participated, orchestrated, managed, supervised, controlled, directed, and/or was in charge of the
31
work being done at the aforesaid project including but not limited to directing the means,
methods and operative details of the work being done by on-site workers, including but not
limited to workers of Defendant, Gray. Defendant McNealy individually and through its agents,
servants, and/or employees participated in coordinating the work being done and designated
various work methods, had a responsibility to maintain a safe premise for all workers,
maintained and checked work progress, and participated in the scheduling of the work and
inspection of the work.
6. That at all relevant times, Defendant McNealy had a duty to exercise reasonable
care in its build, planning, and construction of the subject “delivery station” located in
Edwardsville, Illinois.
7. Notwithstanding its duties, at said time and place, Defendant McNealy by and
through its agents, servants, and employees, was then and there guilty of one or more of the
following careless and negligent acts and/or omissions:
a. Built and/or constructed the subject “delivery station” without a basement or
actual shelter that could provide shelter when Defendant knew that
Edwardsville, Illinois was prone to inclement weather including but not
limited to tornadoes;
b. Built and/or constructed the subject “delivery station” without a “safe room”
that could provide shelter when Defendant knew that Edwardsville, Illinois
was prone to inclement weather including but not limited to tornadoes;
c. Failed to recommend that the subject “delivery station” be built with a
basement shelter, shelter or “safe room” that could provide shelter when
Defendant knew that Edwardsville, Illinois was prone to inclement, severe
weather and/or tornadoes;
d. Built and/or constructed the subject “delivery station” in a “tilt-up” wall
construction manner when Defendant knew or should have known that this
manner of construction causes walls to fall when struck with high winds and
knew that Edwardsville, Illinois was prone to inclement, severe weather and
tornadoes;
32
e. Failed to adequately build the subject “delivery station” in a manner to
prevent walls from collapsing and the roof from separating when struck with
high winds when Defendant knew that Edwardsville, Illinois was prone to
inclement, severe weather and tornadoes;
f. Failed to build the subject “delivery station” pursuant to all local, state, and
federal codes that prevented structural collapse due to inclement weather;
g. Failed to provide a warehouse that was built in compliance with International
Building Code Section 1604; and
h. Was otherwise careless and negligent.
8. Such acts would cause distress in any reasonable person and in fact were the
direct, proximate, and foreseeable cause of the mental anguish and severe emotional distress in
Plaintiffs.
9. Defendant McNealy is liable under the doctrine of respondeat superior for the
individuals responsible for ensuring employee safety as they were acting in the capacity as an
agent, servant, and/or employee of Defendant McNealy, and were acting within the course and
scope of its authority as such. There, the doctrine of Respondent Superior should be applied to
Defendant McNealy as follows:
a. negligent hiring;
b. negligent entrustment;
c. negligent training and safety implementation; and
d. negligent retention.
10. Defendant McNealy acted willfully, recklessly, with conscious disregard for or
with deliberate indifference towards, Plaintiffs’ well-being and Plaintiffs are entitled to recover
punitive damages in such amount as will sufficiently punish Defendant McNealy and as will
serve as an example to prevent repetition of such conduct in the future.
11. As a direct and proximate cause of one or more of the aforementioned careless
negligent acts and/or omissions of Defendant McNealy, the Plaintiffs suffered devastating
33
physical and emotional injuries that they will suffer from for the rest of their lives.
12. As a direct and proximate result of Defendant McNealy’s intentional and reckless
acts, omissions and inactions, Plaintiffs suffered economic harm, including but not limited to:
loss of past and future pay and benefits; loss of career opportunities; loss of future earnings and
other incidentals, loss of benefits of employment, and severe emotional distress, including but
not limited to: loss of self-esteem; difficulty in forming other relationships; mental anguish;
emotional trauma; physical harm; grief; shame; embarrassment; anger; overwhelming sense of
injustice; paranoia, fear, disappointment; insomnia; anxiety; nervousness; worry; and depression.
Plaintiffs has suffered a loss of enjoyment of a normal life because of their physical and
emotional injuries and has lost their ability to engage in the same kinds of normal activities, all to
their damages.
WHEREFORE, Plaintiffs pray for judgment against Defendant, McNealy Engineering,
Inc., in an amount in excess of Fifty-Thousand Dollars ($50,000.00).
COUNT VII: INTENTIONAL INFLICTION OF EMOTIONAL DISTRESS (IIED):
ALL DEFENDANTS
1. Plaintiffs incorporate by reference all preceding paragraphs of this Complaint as if
stated verbatim in Paragraph 1 of Count VII.
2. The intentional and reckless acts, omissions and inactions of Defendants,
Amazon, Contegra, Stock, Gray, and McNealy, were extreme and outrageous and severely
interfered with Plaintiffs’ health, creating a dangerous and deadly environment which led to
Plaintiffs need for psychological help.
3. These intentional and reckless acts, omissions, and inactions by Defendants were
extreme and outrageous and of such a nature as to provoke severe emotional disturbance in any
reasonable person and in fact, were the direct, proximate, and foreseeable cause of mental
34
anguish and severe emotional distress in Plaintiffs.
4. As a direct and proximate result of Defendants’ intentional and reckless acts,
omissions and inactions, Plaintiffs suffered economic harm, including but not limited to: loss of
past and future pay and benefits; loss of career opportunities; loss of future earnings and other
incidentals, loss of benefits of employment, and severe emotional distress, including but not
limited to: loss of self-esteem; difficulty in forming other relationships; mental anguish;
emotional trauma; physical harm; grief; shame; embarrassment; anger; overwhelming sense of
injustice; paranoia, fear, disappointment; insomnia; anxiety; nervousness; worry; and depression.
Plaintiffs have suffered a loss of enjoyment of a normal life because of their physical and
emotional injuries and has lost their ability to engage in the same kinds of normal activities, all to
their damages.
5. Defendants acted with malice toward Plaintiffs and Plaintiffs are entitled to
recover punitive damages in such amount as will sufficiently punish Defendants for their willful
and malicious conduct and as well serve as an example to prevent repetition of such conduct in
the future.
WHEREFORE, Plaintiffs pray for judgment against Defendants, Amazon.com, Inc.,
Amazon Logistics, Inc., Contegra Construction Company, LLC, Tristar Properties, LLC, Stock
& Associates Consulting Engineers, Inc., Gray Design Group, Inc., and McNealy Engineering,
Inc., in an amount in excess of Fifty-Thousand Dollars ($50,000.00).
V.
DAMAGES
1. By reason of all of the above, Plaintiffs have suffered losses and damages in a
sum within the jurisdictional limits of this court, and for which they now sue. Each of the
35
Defendants’ acts and/or omissions, whether taken singularly or in any combination constitutes
negligence and negligence per se which proximately caused the incident and injuries and other
losses as specifically set forth herein, all of which Plaintiffs suffered and which Plaintiffs will
continue to suffer in the future, if not for the remainder of their natural lives.
2. As a direct and proximate result of the incident and the negligent conduct of the
Defendants, Plaintiffs have suffered life-altering damages.
3. By reason of all of the above, Plaintiffs have suffered losses and damages in a
sum within the jurisdictional limits of this Court for which they now sue.
a. An amount reasonably calculated to compensate Plaintiffs for the physical
harm inflicted upon them by Defendants;
b. An amount reasonably calculated to compensate Plaintiffs for their emotional
distress and loss of enjoyment of life;
c. General compensatory damages according to proof;
d. Interest on such damages awarded at the legal rate from the date of
commencement of interest accrual until paid;
e. Costs of suit; and
f. Such other and further relief as the Court deems just and proper.
4. Plaintiffs reserve the right to amend this pleading as discovery progresses in this
case.
VI.
JURY DEMAND
1. Plaintiffs request a trial by jury (12) on all issues.
VII.
PRAYER FOR RELIEF
WHEREFORE, PREMISES CONSIDERED, Plaintiffs request that Defendants be cited
to appear and answer, and that on final trial Plaintiffs have: (1) judgment against Defendants for
36
actual and compensatory damages in accordance with the evidence and the law; (2) pre-judgment
and post-judgment interest as provided by law; (3) costs of court; (4) judgment in an amount in
excess of Fifty-Thousand Dollars ($50,000.00); and (4) such other and further relief, general and
special, to which Plaintiffs may show themselves justly entitled at law or in equity.
Respectfully submitted, this 18th day of April 2022.
By: /s/_____________________
Patrick King (IL Bar #6300213)
Miller King Law Firm
2410 State St.
Alton, IL 62002
Telephone No.: 618.462.8405
Facsimile No.: 618.433.9918
Email: patrick@millerkinglaw.com
Robert C. Hilliard (pro hac vice to be filed)
Michael E. Richardson (pro hac vice to be filed)
Benjamin R. O’Connor (IL Bar # 6321224)
HILLIARD MARTINEZ GONZALES LLP
719719 S. Shoreline Boulevard
Corpus Christi, Texas 78401
Telephone No.: 361.882.1612
Facsimile No.361.882.3015
Email: [email protected] (*Email for
service of pleadings)
Ben Crump (pro hac vice to be filed)
BEN CRUMP LAW PLLC
Florida State Bar No. 72583
122 S. Calhoun Street
Tallahassee, Florida 32301
Telephone No.: (850) 224-2020
ATTORNEYS FOR PLAINTIFFS
37
38